GCB(Dock Office)/TO/S/133/172 |
11 December 2024 |
Syama Prasad Mookerjee Port |
Temporary shutdown of Berth no. 9 (Erstwhile B/8) |
|
Mrn/4B/O/908 |
09 December 2024 |
Syama Prasad Mookerjee Port |
Standardization documents in line with MoPSW's "One Nation One Port Process" Vision. |
|
Mrn/4B/O/908 |
09 December 2024 |
Syama Prasad Mookerjee Port |
Standardization documents in line with MoPSW's "One Nation One Port Process" Vision. |
|
circular of Dec'24 (page 2) |
01 December 2024 |
Adani Mundra Port |
DRAFT AT BERTH AND CHANNEL DEPTH FOR THE MONTH OF DECEMBER 2024 |
|
circular of Dec'24 (page 1) |
01 December 2024 |
Adani Mundra Port |
DRAFT AT BERTH AND CHANNEL DEPTH FOR THE MONTH OF DECEMBER 2024 |
|
JNPA/T/BPVL//TN/2024/1187 |
27 November 2024 |
JNPT |
Shutdown of liquid berth LB01 & LB02 from 06/01/2025 to 10/01/2025 for the maintenance work. |
|
GPPL/MAR/04/2024 |
27 November 2024 |
APM Terminals Pipavav |
Safe Mooring Line Handling - Dimensions and Specifications of Tail Line for Mooring Line Attachment Required for Vessels Calling at Port Pipavav. |
|
PC/PO-2/2024 |
26 November 2024 |
Andhra Pradesh Maritime Board |
Due to cyclone "Fengal" Kakinada Anchorage Port Operations are suspended from 26.11.24 until weather condition subsides. |
|
TD/TM//IMP-47/2024/2004 |
25 November 2024 |
Paradip Port Authority |
Advisory for handling ammonium nitrate vessels at PPA |
|
T.O(Sh&CH)/10/Pt.II/1998 |
11 November 2024 |
Syama Prasad Mookerjee Port |
Reduction of Port Charges for handling of Coastal Thermal Coal from mechanized plant. |
|
T.O(Sh&CH)/10/Pt.II/1999 |
11 November 2024 |
Syama Prasad Mookerjee Port |
Additional rebate on foreign dry bulk cargo for lighterage / top-up operation at anchorages. |
|
Traffic/Traffic/426/Tradepromotion/2023/896 |
04 November 2024 |
Deendayal Port Authority |
Rebate/concession on wharfage charges of bagged cargo |
|
TM/SH/HMC/167 |
01 November 2024 |
Deendayal Port Authority |
Use of HMC for handling of Thermal Coal |
|
Draft declaration 29-10-2024 |
29 October 2024 |
MICT, Mundra |
DRAFT AT BERTH AND CHANNEL DEPTH FOR THE MONTH OF NOVEMBER 2024 (Page 1) |
|
Draft declaration 29-10-2024 |
29 October 2024 |
MICT, Mundra |
DRAFT AT BERTH AND CHANNEL DEPTH FOR THE MONTH OF NOVEMBER 2024 (Page 2) |
|
Traffic/Shipping/2131/rebateVRC/2024/867 |
23 October 2024 |
Deendayal Port Authority |
Rebates/Concessions on Vessel Related Charges |
|
TRA-BECE0CORR/1/2022-TrafficDyTM/3589 |
10 October 2024 |
VO Chidambaranar Port Authority |
Trade Notice Regarding Berthing Parameters at VOC Port, Tuticorin |
|
TF/Shipping(Operation)/2331/OJ-3/735 |
10 September 2024 |
Deendayal Port Authority |
Withdrawal of Oil Jetty No.3 for Upgradation and Strengthening Work- reg. |
|
JNPA/T/BPCL/TN/2024 |
04 September 2024 |
Jawaharlal Nehru Port Authority |
JNPT LB-1 & LB-2 Shutdown from 07.10.2024 to 11.10.2024 for strengthening of pipeline trestle and other works. |
|
TRA-COMM0SOR/2/2022-TrafficSrDTM(2)e.3460/D.472 |
04 September 2024 |
V.O Chidambaranar Port Authority |
Revision of Performance Linked upfront Tariff Schedule for Operating Harbour Mobile Crane at Port Operated Berths in VOCPA w.e.f 06.09.2024 |
|
TF/Shipping(Operation)/2331/OJ-3/706 |
03 September 2024 |
Deendayal Port Authority |
Withdrawal of Oil Jetty No.3 for Upgradation and Strengthening work- reg. |
|
TF/Shipping(Operation)/2331/OJ-3/706 |
03 September 2024 |
Deendayal Port Authority |
Withdrawal of Oil Jetty No.3 for Upgradation and Strengthening work- reg. |
|
AP(D)PL/03/2024 |
01 September 2024 |
Adani Petronet (Dahej) Port Ltd. |
Trade Notice 03- Maintenance of crane at North berth |
|
MR/SH/1120/ |
30 August 2024 |
Deendayal Port Authority |
PERMISSIBLE DRAUGHT FOR SHIPS AND TANKERS AT DEENDAYAL PORT FOR THE MONTHS FROM OCTOBER TO DECEMBER 2024 |
|
MMB/PO/RTN/Tr/898 |
28 August 2024 |
Maharashtra Maritime Board |
Opening of Port in Ratnagiri Group of Ports |
|
TF/Shipping(Opration)/2331/OJ-3/72 |
27 August 2024 |
Deendayal Port Authority |
Withdrawal of Oil Jetty No.3 for Upgradation and Strengthening work - reg. |
|
AP(D)PL/02/2024 |
17 August 2024 |
Adani Petronet (Dahej) Port Ltd. |
Maintenance Dredging from 25th of Sep 2024 to 29th of Sep 2024 |
|
IT/RS/ATM(O)/629 |
08 August 2024 |
Deendayal Port Limited |
Temperature maintenance in the cargo tanks. |
|
NMPA/DC/Per.Draft/2024/08 |
07 August 2024 |
New Mangalore Port Authority |
MAXIMUM PERMISSIBLE DRAFT AT NEW MANGALORE PORT REDUCED TO 13.75 M WITH 1 M HEIGHT OF RAISING TIDE |
|
Traffic/Traffic/426/Tradepromotion/2023/569 |
24 July 2024 |
Deendayal Port Authority |
Levy of Berth Hire Charges at Cargo Jetty-02, 03 and 10 |
|
ITRA/SHP/CIR |
20 July 2024 |
Visakhapatnam Port Authority |
improving the capacity utilization of OR-1 & OR-2 berths in Inner Harbours of Visakhapatnam Port Phase-III- Works- Dredging in SDR/Weathered Rock by Underwater controlled blasting - Window for vessel movements in western arm Channel in day time- Approval - Reg. |
|
PC/PO-1/2024 |
18 July 2024 |
Andhra Pradesh Maritime Board |
Suspension of Port operations wef 1200 hours 18.07.2024 at Kakinada Anchorage Port |
|
Traffic/Shipping/2131rebateVRC/2024/549 |
18 July 2024 |
Deendayal Port Authority |
Rebates/Concessions on Vessel Related Charges |
|
Fin/Rev/CT/BOT/2024/735 |
12 July 2024 |
Jawaharlal Nehru Port Authority |
Levy of Seafarers Club Charges |
|
Traffic/Shipping/587/Berthing Policy/2023/531 |
11 July 2024 |
Deendayal Port Authority |
REVISED BERTHING POLICY WEF 15TH JULY 2024. |
|
Trade notice 02 |
09 July 2024 |
Adani Mundra Port |
Gangway safety instructions for vessels calling at Mundra Port |
|
T.O.(Sh&CH)/10/Pt-II/1203 |
02 July 2024 |
Syama Prasad Mookerjee Port |
suspension of operations at Berth 16(O) (erstwhile HOJ I) at HDC, SMPK for a period of 4 days w.e.f 15.07.2024. |
|
FD/Costing/NLP/TC/MISC/2020 |
02 July 2024 |
Cochin Port Authority |
Trade circular regarding Sagar Setu Portal |
|
T.O(Sh&CH)10/Pt-II/1210 |
02 July 2024 |
Syama Prasad Mookerjee Port, Kolkata |
Suspension of operations at Berth 16(O) (erstwhile HOJ I) at HDC, SMPK for a period of 4 days w.e.f 22.07.2024 |
|
JNPA 01.07.2024 |
01 July 2024 |
JNPA BPCL |
First phase shut down of BPCL Liquid Cargo Jetty from 05.08.2024 to 09.08.2024 due to strenghtening of pipeline trestle |
|
TN No. 191 |
21 June 2024 |
IGTPL (DP WORLD), KOCHI |
14 days free time raw cotton imports |
|
TF/Shipping(Operations)/1784/475 |
21 June 2024 |
Deendayal Port Authority |
Restriction of handling vessel at Oil Jetty No.2 for the work of revamping of existing Pipeline Network - reg |
|
JNP/Marine/Berthing/Guidelines/2024/395 |
12 June 2024 |
Jawaharlal Nehru Port Authority |
Berthing Guidelines Circular |
|
TD/TM/GEN-201(PT-1)/988 |
10 June 2024 |
Paradip port Authority |
Amended Berthing Policy for the FY 2024-25 - reg. |
|
MD/SHS/TECH-26/2023/576 |
23 May 2024 |
Paradip Port Authority |
Ceasing Operation at Mooring Berth off FB-I |
|
Traffic/Shipping(Operation)/1985/2024/348 |
23 May 2024 |
Deendayal Port Authority |
Productivity norms for Yellow Peas in Bulk -Reg |
|
DEMS-RSMC TROPICAL CYCLONES NEW DELHI DATED 22.05.2024 |
22 May 2024 |
REGIONAL SPECIALISED METEOROLOGICAL CENTRE-TROPICAL CYCLONES, NEW DELHI |
TROPICAL WEATHER OUTLOOK |
|
MMB/PO/RTN/Tr/463 |
21 May 2024 |
Maharashtra Maritime Board, Ratnagiri |
Restricted operation by Inland Vessels during foul season- Reg. |
|
DC/S(21)/2024/00696 |
20 May 2024 |
Mormugao Port Authority |
Monsoon Circular- 2024 |
|
AKPL/Marine/03/24-25 |
20 May 2024 |
Adani Krishnapatnam Port Ltd. |
Tariff for wharfage charges at Adani Krishnapatnam Port Ltd. |
|
GMB/POP/T/245 |
17 May 2024 |
Gujarat Maritime Board |
CIRCULAR — Safety Measures during Monsoon Period |
|
GMB/OKP/T.O/202/2024 |
16 May 2024 |
Gujarat Maritime Board |
Safety Measures during Monsoon Period |
|
KKPL/MAR/04/2024-25 |
16 May 2024 |
Karaikal Port Authority |
Revision of Maximum Permissible Draft wef 01st June 2024 |
|
AGPL/MAR/CIR/2024-25/005 |
16 May 2024 |
Adani Gangavaram Port Ltd |
Revised Fuel Surcharge |
|
DPCL/TRADE/05/2024 |
15 May 2024 |
Dhamra Port |
Trade Notice - Inclusion of new tariffs |
|
AKPL/Marine/02/24-25 |
14 May 2024 |
Adani Krishnapatnam Port Ltd. |
Toll box Talk (TBT) conduction by vessel staff |
|
NMPA/DTM (N)/ 2024 |
13 May 2024 |
New Mangalore Port Authority |
Bad Weather Advisory for Port Users and PPP Terminals |
|
NMPT/DTM/BP/2024 |
10 May 2024 |
New Mangalore Port Authority |
Berthing Policy for Dry Bulk Cargo Vessels at New Mangalore Port Authority - Reg.
|
|
DC/GF(M)/Circular/2024 |
08 May 2024 |
Cochin Port Authority |
MONSOON CIRCULAR 2024 |
|
TRA-BERT/1/2024-Traffic(C.No.5378)D.106 |
07 May 2024 |
V.O Chidambaranar Port Authority |
Berthing of vessels at NCB ll -Reg |
|
DPL/Marine/46/2024-25 |
01 May 2024 |
Dighi Port Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
KPPL/FS/R46/2024-25 |
01 May 2024 |
Karaikal Port Private Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
APSEZ/FS/R46/2024-25 |
01 May 2024 |
Adani Mundra Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AHPL/FS/R46/2024-25 |
01 May 2024 |
Adani Hazira Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AP(D)PL/FS/R46/2024-25 |
01 May 2024 |
Adani Petronet (Dahej) Port Pvt. Ltd. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
SDM/GEN/MONSOON/2024/211 |
26 April 2024 |
Mumbai Port Trust |
Operation of storm Gate during monsoon season |
|
Cochin immigration |
25 April 2024 |
Cochin Sea Port |
Mandatory requirement of visa for foreign crew working on foreign flag vessel converted to coastal run for more than a month |
|
NMPA/DTM (N)/ 2024 |
20 April 2024 |
New Mangalore Port Authority |
Bad Weather Advisory for Port Users and PPP Terminals |
|
AKPL/Marine/01/24-25 |
16 April 2024 |
Adani Krishnapatnam Port Ltd. |
DG shipping Order No. 08 of 2024 regarding Introduction of Online Ship’s Reporting |
|
JSW circular 12-04-2024 |
12 April 2024 |
JSW Jaigarh Port Ltd |
JSW JPL Pilotage Cancellation Fee Policy |
|
Tfc/G-6258/Circular |
12 April 2024 |
Syama Prasad Mookerjee Port |
Restoration of the policy of vessels calling on neaping priority |
|
Tfc/G-6258/Circular |
11 April 2024 |
Syama Prasad Mookerjee Port |
Resumption of Vessel & Barge operation at KPD |
|
DC/SoP for crew change/2020 |
09 April 2024 |
Cochin Port Authority |
Waiver of Port Charges for the Maritime Services for ships taking bunker supply at the outer anchorage of Cochin Port |
|
T.O.(Sh&CH)/10/717 |
09 April 2024 |
Syama Prasad Mookerjee Port |
Withdrawal of Trade Circular pertaining to debarment imposed on MT ASPHALT EXPRESS (IMO 9394739) from operating at Haldia Dock Complex, SMPK. |
|
TD/DTM RLY/09/2023/612 |
09 April 2024 |
Paradip Port Authority |
Revision of Terminal Charges- Reg. |
|
TD/DTM/RLY-05(VOL-II)/2019/607 |
08 April 2024 |
Traffic Department, Paradip Port Authority |
Providing details related to Transit pass for i3MS portal - Reg. |
|
april 2024 |
01 April 2024 |
APSEZL MUNDRA |
DRAFT AT BERTH AND CHANNEL DEPTH FOR THE MONTH OF APRIL 2024 |
|
TF/Shipping(Operations)/830/186 |
30 March 2024 |
Deendayal Port Authority |
Withdrawal of Oil Jetty No.2 for the work of revamping of existing Pipeline Network.- reg. |
|
TF/Shipping(Operations)/830/185 |
27 March 2024 |
Deendayal Port Authority |
Withdrawal of Oil Jetty No.5 for Installation of New Ammonia Unloading Arm by IFFCO from 27.03.2024 to 04.04.2024. |
|
Marine/Harbour Master-Accountants/518/VRCremittance/2023-163 |
26 March 2024 |
Deendayal Port Authority |
Payment of VRC (Vessel Related Charges) in Advance |
|
TO(Sh&CH)/10/Pt-II/598 |
23 March 2024 |
Syama Prasad Mookerjee Port, Kolkata |
Suspension of operation at Berth17(O) [erstwhile HOJ- 2] of HDC from 19/04/2024 |
|
AGPL/MAR/CIR/2023-24/036 |
16 March 2024 |
Adani Gangavaram Port |
Revised Fuel Surcharge |
|
Traffic/Traffic/426/Trade promotion/2023$PF1/136 |
12 March 2024 |
Deendayal Port Authority |
Levy of Berth Hire Charges at Cargo Jetty-02, 03 and 10 |
|
9th march 2024 |
09 March 2024 |
APM Pipavav Terminal |
Immigration Instruction for agents |
|
march 2024 |
02 March 2024 |
APSEZL MUNDRA |
DRAFT AT BERTH AND CHANNEL DEPTH FOR THE MONTH OF MARCH 2024 |
|
APSEZ/FS/R42/2023-24 |
01 March 2024 |
Adani Ports and Logistics ltd, Mundra |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
DPL/Marine/42/2023-24 |
01 March 2024 |
Dighi Port Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AHPL/FS/R42/2023-24 |
01 March 2024 |
Adani Hazira Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AP(D)PL/FS/R42/2023-24 |
01 March 2024 |
Adani Petronet (Dahej) Port Pvt. Ltd. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
TD/TM/GEN-23(XII)/388 |
28 February 2024 |
Paradip Port Authority |
75% vessel related charges' concession to Container Vessels for the year FY 2024-25 |
|
TD/TM/GEN-201(PT-1)/385 |
28 February 2024 |
Paradip Port Authority |
Berthing Policy for vessels for the FY 2024-25 |
|
GMB/T/SOP(Cargo storage plot allotment)/127/897 |
27 February 2024 |
Gujarat Maritime Board |
Implementation of SOP for cargo storage plot allotment at GMB owned and operated ports |
|
GMB/Traffic/SOP(CSPA)/127/898 |
27 February 2024 |
Gujarat Maritime Board |
Implementation of Revised Regulations for stevedoring activities and SOP for CSPA |
|
TF/Shipping(Operations)/830/74 |
20 February 2024 |
Deendayal Port Authority |
Withdrawal of Oil Jetty No.3 for Maintenance Work from 21.02.2024 to 27.02.2024 |
|
TF/Shipping(Operations)/830/73 |
19 February 2024 |
Deendayal Port Authority |
Withdrawal of Cargo Jetty No.6 for Dredging Work- reg |
|
APSEZ/FS/R41/2023-24 |
16 February 2024 |
Adani Ports and Special Economic Zone Ltd (Mundra) |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AHPL/FS/R41/2023-24 |
16 February 2024 |
Adani Hazira Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AP(D)PL/FS/R41/2023-24 |
16 February 2024 |
Adani Petronet (Dahej) Port Pvt. Ltd. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
tide table for 2024 |
15 February 2024 |
Deendayal Port Authority |
Tide Table 2024 |
|
TF/SH/Gen.correspondence/2022/53 |
14 February 2024 |
Deendayal Port Authority |
Productivity norms for Lentils in bulk- Reg. |
|
13-28/1/2024-ENGG - DGS |
13 February 2024 |
DG SHIPPING, MUMBAI |
Implementation of MARPOL Annex VI: Consolidation of all DGS Order/MS Notices/Circulars and Amendments to MARPOL Annex VI |
|
AKPL/Marine/12/23-24 |
06 February 2024 |
Adani Krishnapatnam Port Ltd |
Cessation Notice to the Force Majeure invoked vide notice dated 08-12-2023. |
|
AGPL/MAR/CIR/2023-24/025 |
01 February 2024 |
Adani Gangavaram Port |
Revised Fuel surcharge on Pilotage Dated 01.02.2024 |
|
APSEZ/FS/R40/2023-24 |
01 February 2024 |
Adani Ports and Special Economic Zone Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AHPL/FS/R40/2023-24 |
01 February 2024 |
Adani Hazira Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AP(D)PL/FS/R40/2023-24 |
01 February 2024 |
Adani Petronet (Dahej) Port Pvt. Ltd. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
KPPL/FS/R40/2023-24 |
01 February 2024 |
Karaikal Port Private Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
DPL/Marine/40/2023-24 |
01 February 2024 |
Dighi Port Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
circular- 24 jan'24 |
24 January 2024 |
Adani Ports and Logistics |
Circular on elimination of single use of plastic products inside ports. |
|
JNP/Fin/Rev/Tariff/2023-24/ |
24 January 2024 |
Jawaharlal Nehru Port Authority |
TRADE NOTICE- 20% Discount in berth hire charges discontinued from 31/01/2024. |
|
TM/02/24/2023/00213 |
23 January 2024 |
Mormugao Port Authority |
Royalty of stevedoring and shore handling of dry bulk and break bulk cargo - reg. |
|
TD/TM/IMP-46/127 |
18 January 2024 |
Paradip Port Authority |
Office Order from Traffic Dept (PPA) |
|
Circular Jan 2024 |
17 January 2024 |
Nellore Distract Chamber of Commerce & Industry |
List of General Holidays for the year 2024. |
|
TD/TM/GEN-281/94 |
16 January 2024 |
Paradip Port Authority |
Office Order from Traffic Dept PPA |
|
TD/OPN/MAR-767/95 |
16 January 2024 |
Paradip Port Authority |
Berth hire is not chargeable when the ship is shifted for port convenience or other port related issues. |
|
TF/Shipping(Operations)/1501/57 |
11 January 2024 |
Deendayal Port Authority |
Restriction of Cargo handling at Oil Jetty no 2, 3 and 4 - reg |
|
TF/Shipping(Operations)/830/52 |
11 January 2024 |
Deendayal Port Authority |
Withdrawal of Oil Jetty No.1 for Maintenance Dredging work -reg. |
|
DC/Bunker Barges/Waiver/2014-15 |
08 January 2024 |
Cochin Port Authority |
waiver of shifting pilotage for bunker barges. |
|
ITRA/SHP/FNWWC |
05 January 2024 |
Visakhapatnam Port Authority |
Declaration of Non-Weather Working Days on 4th, 5th & 6th December 2023- reg |
|
Jan 2024 |
05 January 2024 |
PARADIP PORT AUTHORITY |
General instruction - 2024 to Vessels calling Paradip Port. |
|
MD/SHS/TECH-26/2023/19 |
05 January 2024 |
Paradip Port Authority |
Circular Regarding Increase in LOA/BEAM/DRAFT |
|
TO(Sh&CH)/10/23 |
03 January 2024 |
Syama Prasad Mookerjee Port, Kolkata |
Trade Circular in regard to concession of VRC on container vessels |
|
Jan 2024 |
03 January 2024 |
The Gandhidham Chamber of Commerce & Industry |
CHARTER PARTY HOLIDAYS FOR THE YEAR 2024 |
|
January 2024 |
02 January 2024 |
Adani ports and logistics, mundra |
REVISED DRAFT AT BERTH AND CHANNEL DEPTH FOR THE MONTH OF JANUARY 2024 |
|
TF/Shipping(Operations)/830/16 |
02 January 2024 |
Deendayal Port Authority |
Cargo Jetty No. 7- withdrawal for dredging work. |
|
TN No.182 |
01 January 2024 |
DP World Cochin Trade Notice |
Free Storage of 15 days for railway containers. |
|
AHPL/FS/R38/2023-24 |
01 January 2024 |
Adani Hazira Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AKPL/FS/R38/2023-24 |
01 January 2024 |
Adani Krishnapatnam Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AP(D)PL/FS/R38/2023-24 |
01 January 2024 |
Adani Petronet (Dahej) Port Pvt. Ltd. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
APSEZ/FS/R38/2023-24 |
01 January 2024 |
Adani Ports and Special Economic Zone Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices. |
|
TN No. 181 |
01 January 2024 |
DP World Cochin Trade Notice |
Extended free time for Export laden containers through Mainline Vessels calling DP World Cochin on a weekly schedule |
|
TN No. 180 |
01 January 2024 |
DP World Cochin Trade Notice |
PTI Special Discounted Rates |
|
TN No. 178 |
01 January 2024 |
DP World Cochin Trade Notice |
Free Dwell Time For Imports/ Exports laden container |
|
TN No. 179 |
01 January 2024 |
DP World Cochin Trade Notice |
14 Days Free TIme for Cashew Imports |
|
AGPL/MAR/CIR/2023-24/023 |
01 January 2024 |
ADANI GANGAVARAM PORT LTD. |
REVISED FUEL SURCHARGE |
|
pipavav 2024 |
30 December 2023 |
Pipavav |
APM Terminal Pipavav - Tide Table - 2024 |
|
Traffic/Shipping(Operation)/1402/2023/759 |
29 December 2023 |
Deendayal Port Authority |
Productivity norms for soda ash in bulk- reg. |
|
Traffic/Shipping(Operation)/1330/2023/760 |
29 December 2023 |
Deendayal Port Authority |
Productivity norms for pig iron in bulk-reg. |
|
D4/Holiday-2024/23-S |
28 December 2023 |
Cochin Port Authority |
holidays for the port offices/ wharves and all employees attached to the out door establishment, including Shore labourers for the year 2024. |
|
ITRA/SHP/FCIR |
28 December 2023 |
Visakhapatnam Port Authority. |
Visakhapatnam Port - Delay in commencement of Cargo handling Operations T.Circular dated 28-12-2023 |
|
AKPL/MARINE/11/23-24 |
27 December 2023 |
Adani Krishnapatnam Port ltd. |
Force Majeure Addendum No 3-Reg |
|
27-12-2023 |
26 December 2023 |
Chennai Port Authority |
Charter Party Holiday List for the Year 2024 |
|
13/2022-2023 |
22 December 2023 |
The Cochin Chamber of Commerce & Industry |
CHARTER PARTY HOLIDAYS FOR THE YEAR 2024 |
|
VIII/48/03/2020-Cus.Pol |
22 December 2023 |
Custom House, Tuticorin |
Waiver of penalty for late filing of Bills of Entry Due to Cyclonic Storm and heavy rain - Reg. |
|
tide table circular for the year 2024 |
19 December 2023 |
Gulf of Kutch: MMPT (Adani Ports, Mundra) |
draft forecast for the year 2024 at Mundra Port |
|
MRN/HMR/99/19 |
19 December 2023 |
S.M.P KOLKATA (HALDIA) |
HALDIA PORT AUTHORITY REDUCED PREDICTED DRAFT BY 0.20 METERS AT SAGAR ISLAND, GANGRA & HALDIA |
|
AKPL/Marine/09/23-24 |
19 December 2023 |
Adani Krishnapatnam Port Ltd |
Addendum to Force Majeure Notice dated 08-12-2023 |
|
AP(D)PL/FS/R37/2023-24 |
16 December 2023 |
Adani Petronet (Dahej) Port Pvt. Ltd. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AHPL/FS/R37/2023-24 |
16 December 2023 |
Adani Hazira Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
DPL/Marine/37/2023-24 |
16 December 2023 |
Dighi Port Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AP(D)PL/08/2023 |
16 December 2023 |
Adani Ports and Logistics, Dahej |
Dredging work 04th of Jan 2024 – 06th of Jan 2024 |
|
.AP(D)PL/08/2023 |
16 December 2023 |
Adani Petronet (Dahej) Port Ltd. |
Dredging work 04th of Jan 2024 – 06th of Jan 2024 |
|
APSEZ/FS/R37/2023-24 |
16 December 2023 |
Adani Ports and Special Economic Zone Ltd, Mundra |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AKPL/FS/R37/2023-24 |
16 December 2023 |
Adani Krishnapatnam Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
TRAFFIC/TRAFFIC/1358/KICTVRC/2023/716 |
15 December 2023 |
DEENDAYAL PORT AUTHORITY |
REBATE/CONCESSION ON VESSEL RELATED CHARGES (VRC) IN SCALE OF RATES FO RTHE CONTAINER VESSELS CALLING AT DEENDAYAL PORT |
|
circular-crew |
12 December 2023 |
AFRRO, BOI, SEAPORT, MORMUGAO |
CREW SHORE LEAVE PASS - IN PERSON APPEARANCE, PASSPORT AND CDCs COMPULSORY FOR ISSUANCE OF SLP AND CANCELLATION. |
|
circular- list of holidays, vizag |
11 December 2023 |
The Vizagapatnam Chamber of Commerce and Industry |
Vizag - Charter Party Holidays For The Year 2024 |
|
AKPL/Marine/08/23-24 |
08 December 2023 |
ADANI KRISHNAPTNAM PORT LTD |
NOTICE OF 'FORCE MAJEURE' AS PORT OPERATIONS BADLY AFFECTED BY THESEVER CYCLONE 'MICHAUNG'- DECLARATION OF FORCE MAJEURE EVENT AT KRISHNAPATNAM PORT. |
|
MR/SH/1120/ |
07 December 2023 |
DEENDAYAL PORT AUTHORITY |
REVISED PERMISSIBLE DRAFT CIRCULAR FOR THE MONTH OF JANUARY TO MARCH,2024. |
|
MR/SH/1120/ |
07 December 2023 |
Deendayal Port Authority |
REVISED PERMISSIBLE DRAFT CIRCULAR FOR THE MONTH OF JANUARY TO MARCH,2024 |
|
MR/SH/1120/ |
07 December 2023 |
Deendayal Port Authority |
REVISED PERMISSIBLE DRAFT CIRCULAR FOR THE MONTH OF JANUARY TO MARCH,2024 |
|
JNP/Marine/Berthing/Guidelines/2023/1350 |
06 December 2023 |
Jawaharlal Nehru Port Authority |
Berthing Guidelines Circular |
|
MR/SH/1120/2023 |
05 December 2023 |
Deendayal Port Authority |
PERMISSIBLE DRAFT CIRCULAR FOR THE MONTH OF JANUARY TO MARCH,2024. |
|
MRN/4E/O/927 |
05 December 2023 |
Syamaprasad Mookerjee Port (S.M.P), Kolkata |
Trade Circular regarding non operational new 'X' Point anchorage at sagar anchorage. |
|
december 2023 |
01 December 2023 |
Adani Ports and Logistics, Mundra |
DRAFT AT BERTH AND CHANNEL DEPTH FOR THE MONTH OF DECEMBER 2023 |
|
APSEZ/LPG/001/2023-24 |
01 December 2023 |
APSEZL MUNDRA |
Testing Facility of LPG Samples at Mundra LPG Terminal Laboratory |
|
MRN/HMR/KD/280 |
01 December 2023 |
SMP Kolkata |
ESTIMATED FRESH WATER DRAFT FORECAST FOR THE MONTH OF JAN'2024 FOR KOLKATA (Lighted channel draft) |
|
APSEZ/FS/R36/2023-24 |
01 December 2023 |
Adani Ports and Logistics, Mundra |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AP(D)PL/FS/R36/2023-24 |
01 December 2023 |
Adani Petronet (Dahej) Port Pvt Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
MIDPL/FS/R36/2023-24 |
01 December 2023 |
Adani Ports and Logistics (Kattupalli) |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AKPL/FS/R36/2023-24 |
01 December 2023 |
Adani Krishnapatnam Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
KPPL/FS/R36/2023-24 |
01 December 2023 |
Karaikal Port Private Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AHPL/FS/R36/2023-24 |
01 December 2023 |
Adani Hazira Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
DPCL/FS/R36/2023-24 |
01 December 2023 |
The Dhamra Port Company Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
DPL/Marine/36/2023-24 |
01 December 2023 |
Dighi Port Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
Shipping-Gate/095/Berthing/2023/670 |
30 November 2023 |
Deendayal Port Authority |
Latest Berthing Norms (bulk & breakbulk cargo) |
|
MRN/HMR/DH/172 |
30 November 2023 |
S.M.P Kolkata |
ESTMATED FRESH WATER DRAFT FORECAST FOR THE MONTH OF Jan'2024 FOR
DIAMOND HARBOUR FOR VESSELS OF 12KTS. & OVER (SUBJECT TO ALTERATION) |
|
GAD/HS/GC/12(22)/2023/03239 |
30 November 2023 |
Mormugao Port Authority |
Change in the name of MPA Administrative office Building. |
|
MRN/HMR/SR/280 |
30 November 2023 |
Kolkata Port Trust |
ESTIMATED FRESH WATER DRAFT FORECAST FOR THE MONTH OF JAN'2024
FOR SAGAR ROADS FOR VESSELS OF 12KTS. & OVER (SUBJECT TO ALTERATION) |
|
NMPA/DC/Per.Draft/2023/07 |
27 November 2023 |
New Mangalore Port Authority |
Permissible Draft at New Mangalore Port Berth No.15 & 16 increased to 14 M with 1 M height of raising tide |
|
15/0431 |
23 November 2023 |
Jamnagar chamber of commerce & industry. |
Charter party holiday for the year 2024 |
|
Mrn/55A/O/875 |
21 November 2023 |
Syama Prasad Mookerjee Port, Kolkata |
Acceptance of revised vessel dimension at NSD |
|
GAD/GS/1(9)/2023/03091 |
16 November 2023 |
MORMUGAO PORT AUTHORITY |
Holiday list for the year 2024 |
|
Shipping-Gate/095/Berthing/2023/602 |
08 November 2023 |
Deendayal Port Authority |
berthing policy for cargo / tanker vessels |
|
Traffic/Shipping(Operations)/1307/2023/606 |
08 November 2023 |
Deendayal Port Authority |
PRODUCTIVITY NORMS FOR DRIED RAW CASHEW NUTS |
|
Traffic/Shipping(Operation)/1306/2023/605 |
08 November 2023 |
Deendayal Port Authority |
Productivity norms for woodchips-reg. |
|
AHPL/Marine/06/2023 |
07 November 2023 |
Adani Hazira Port Ltd. |
Submission of Ballast Water Form |
|
AGPL/MAR/CIR/2023-24/018 |
01 November 2023 |
ADANI GANGAVARAM PORT LTD |
REVISED FUEL SURCHARGE |
|
01 NOVEMBER 2023 |
01 November 2023 |
Adani Ports and Special Economic Zone Ltd, Mundra |
DRAFT AT BERTH AND CHANNEL DEPTH FOR THE MONTH OF NOVEMBER 2023 |
|
JSWJPL/30-10-2023 |
30 October 2023 |
JSW JAIGARH PORT LTD |
Covid Restriction Withdrawal |
|
A1/302/Timber/2023/T |
17 October 2023 |
Cochin Port Authority |
Concession in VRC & Storage Charges for Timber Log lmports |
|
AKPL/FS/R33/2023-24 |
16 October 2023 |
Adani Krishnapatnam Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
DPL/Marine/33/2023-24 |
16 October 2023 |
Dighi Port Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AP(D)PL/FS/R33/2023-24 |
16 October 2023 |
Adani Petronet (Dahej) Port Pvt. Ltd. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AHPL/FS/R33/2023-24 |
16 October 2023 |
Adani Hazira Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
DPCL/FS/R33/2023-24 |
16 October 2023 |
The Dhamra Port Company Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
APSEZ/FS/R33/2023-24 |
16 October 2023 |
Adani Ports and Special Economic Zone Ltd, Mundra |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
MD/SHS/TECH-26/2023/1277 |
05 October 2023 |
Paradip Port Authority |
Paradip Port Authority increased vessel beam acceptance upto 46m. for further details, please check the attachment. |
|
AKPL/Marine/03/23-24 |
12 September 2023 |
Adani Krishnapatnam Port Ltd |
Wearing of Life jackets/Life vest while working near waterfront -Reg |
|
E2/3406/2006 |
11 September 2023 |
Kerala Maritime Board |
ISPS to Beypore Port |
|
TM/0210/2023/01409 |
07 September 2023 |
MORMUGAO PORT AUTHORITY |
Handling Iron Ore and Iron Ore Pellets at WOB Anchorage - Concessional Traffic reg |
|
AGPL/MAR/CIR/2023-24/013 |
04 September 2023 |
Adani Gangavaram Port Ltd |
Revised Fuel Surcharge |
|
AKPL/FS/R30/2023-24 |
01 September 2023 |
Adani Ports and Logistics, Krishnapatnam Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AHPL/FS/R30/2023-24 |
01 September 2023 |
Adani Hazira Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AP(D)PL/FS/R30/2023-24 |
01 September 2023 |
Adani Petronet (Dahej) Port Pvt. Ltd. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
MIDPL/FS/R30/2023-24 |
01 September 2023 |
Adani Ports and Logistics, Kattupalli Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
DPL/Marine//2023-24 |
01 September 2023 |
Adani Ports and Logistics, Dighi Port Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
DPCL/FS/R30/2023-24 |
01 September 2023 |
Adani Port and Logistics, Dhamra Port Company Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
APSEZ/FS/R30/2023-24 |
01 September 2023 |
APSEZ, Mundra |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
MMB/PO/RTN/Tr/877 |
30 August 2023 |
MAHARASHTRA MARITIME BOARD, RATNAGIRI |
Port Circular Opening Of Ports In Ratnagiri. |
|
TD/TM/GEN-249/1789 |
24 August 2023 |
PARADIP PORT AUTHOURITY |
CUSTOMER REGISTRATION AND EXTENDING CUSTOMER ROLE IN EBS PORTAL |
|
Traffic/Dtm(Opn)/016/VEHICLECULARTRAFFIC/2020/1784 |
24 August 2023 |
PARADIP PORT AUTHORITY |
TRAFFIC PLAN OF PARADIP PORT FOR MOVEMENT AND CONTROL OF VEHICULAR TRAFFIC INSIDE PORT |
|
TD/DTM/RLY/08/2023-24/1762 |
21 August 2023 |
PARADIP PORT AUTHORITY |
REQUEST TO COVER ALL LOADED WAGONS CARRYING DRY BULK CARGO BY USING GOOD QUALITY TARPAULIN SHEET |
|
Marine / Harbour Master - Accounts / 518/ VRC remittance / 2023 / 3950 |
16 August 2023 |
Deendayal Port Authority |
Vessel related charges to be paid in advance i.e. before pilot of DPA board, failing which the interest as per the rates of SOR will be applicable. |
|
Traffic/Traffic/908/steelpipes/2023/361 |
14 August 2023 |
Deendayal Port Authority |
PRODUCTIVITY NORMS FOR OVER DIMENSIONAL STEEL PIPES.-reg
|
|
TF/SH/DREDGING/2023/319 |
07 August 2023 |
Deendayal Port Authority |
FINALIZATION OF DISCHARGE SEQUENCES FOR EDIBLE OIL SHIPS |
|
FD/costing/SoR/ |
04 August 2023 |
Cochin Port Authority |
RE DEVELOPMENTS IN COCHIN PORT - UPDATE ON MULT - LPG JETTY - PORT CHARGES |
|
EO/TF/SH/808/Royalty/2023/301 |
02 August 2023 |
DEENDAYAL PORT AUTHORITY |
Levying of Royalty @ Rs.8.97 per MT from Stevedores for combined Stevedoring & Shore Handling activities from 01.04.2023 |
|
NMPA/TM/Cruise/2022-23 |
02 August 2023 |
New Mangalore Port Authority |
Rationalization of tariff for cruise vessels arriving in India. - Reg |
|
august 2023 |
01 August 2023 |
Adani Ports and Special Economic Zone Ltd |
APSEZL MUNDRA MONTHLY DRAFT DECLARATION - AUGUST - 2023 |
|
175 |
01 August 2023 |
DP World, Cochin |
Free Dwell Time for Import/ Export laden containers |
|
NMPT/DC/PER.DRAFT/2023/06 |
01 August 2023 |
NEW MANGALORE PORT AUTHORITY |
MAXIMUM PERMISSIBLE DRAFT AT NEW MANGALORE PORT.
The maximum permissible draft in the approach channel and at berth no.10, 11, 13, 14, 15 & 16 at New Mangalore Port has been reduced to 13.75 M with 1 M height of rising tide with immediate effect due to continuous siltation.
|
|
FD/Costing/SoR Revision I 2022 |
31 July 2023 |
Cochin Port Authority |
Continue the existing Scale of Rates of the Port - reg. |
|
30/07/2023 |
30 July 2023 |
APM TERMINAL PIPAVAV |
Safe Memo for Dry Cargo Berths
Depths in berth pockets: GP1,2 & 3 14 meters & GP4:15.5 meters and liquid jetty : 13.0 meters
Max per vessel size: Containers: GP4- LOA 367m Beam: 50 m Draft: 14.5m Disp: 150000 mts
GP4: LOA 315m Beam: 50 m Draft: 14.0 m Disp: 100000 mts
Bulk: LOA 240m Beam: 40 m Draft: 14.0 m Disp: 100000 mts
|
|
TD/TM/GEN-281/1590 |
28 July 2023 |
PARADIP PORT AUTHORITY |
OPERATIONAL CONSTRAINT DUE TO HIGH AIR DRAUGHT OF VESSEL DURING BERTHING AT IOHP |
|
FD/Costing/SoR Revision/2022. |
25 July 2023 |
Cochin Port Authority |
Revision of General Scale of Rates of Cochin Port Authority |
|
NMPA/DTM (N)/2023 |
24 July 2023 |
New Mangalore Port Authority |
Flood Preparedness by Port Users and PPP Terminals- Reg.
Ref: Trade Circular of even no. dated 03.05.2023 |
|
Traffic/Shipping/587/Berthingpolicy/2023$PF1/ 46 |
21 July 2023 |
Deendayal Port Authority |
The number of Edible Oil tankers to be berthed at Oil Jetty No. 1 to 4 will be restricted to one subject to they are being senior to non-edible liquid tankers. There will be no restriction on berthing of non-edible liquid tankers. |
|
NMPT/DC/Per.Draft/2023/05 |
14 July 2023 |
New Mangalore Port Authority |
Maximum permissible draft in the New Mangalore Port approach channel and at berth no.10, 11, 13, 14, 15 and 16 with 1 M height of rising tide |
|
draft circular dated 03-07-2023 |
03 July 2023 |
Adani Ports and Logistics, Mundra |
DRAFT AT BERTH AND CHANNEL DEPTH FOR THE MONTH OF JULY 2023 |
|
ITRA/SOP/FMISC |
28 June 2023 |
Visakhapatnam Port Authority |
Hoisting of Save All Nets at all working hatches of the vessel - Reg |
|
ITRA/SHP/PCS |
28 June 2023 |
Visakhapatnam Port Authority |
Implementation of PHO Module functionality of National Logistics Portal- Marine- Reg |
|
Traffic/Safety/580/Ship Bunkering Activity//2023/41 |
28 June 2023 |
Deendayal Port Authority |
Guideline Regarding Ship Bunkering Activity |
|
GPPL/MAR/02/2023 |
26 June 2023 |
APM Terminals Pipavav |
Declaration of deficiency |
|
GPL/MAR/03/2023 |
26 June 2023 |
APM Terminals Pipavav |
Services within port limits |
|
Marine/Harbour Master-Accounts/466/NONWEATHERWORKINGDAYS/2023/3732 |
23 June 2023 |
Deendayal Port Authority |
Non weather working days |
|
TD/TM/GEN-275/1345 |
23 June 2023 |
Paradip Port Authority |
Implementation of SAGAR SETU (NLP-M)- Port Health Organization Module-Training to shipping agents -reg |
|
MMD/KOCHI/SOC/2023/002 |
23 June 2023 |
Vizhinjam Internation Seaport Ltd (VISL) |
Certification of ISPS Code |
|
TD/TM/GEN-275/1345 |
23 June 2023 |
PARADIP PORT AUTHORITY |
IMPLEMENTATION OF SAGAR SETU (NPL-M)- PORT HEALTH ORGANISATION (PHO) MODULE- TRAINING SHIPPING AGENTS- REG |
|
TD/TM/GEN-80(IV)/1329 |
22 June 2023 |
Paradip Port Authority |
REFERENCE TO NOTIFICATION OF DANGEROUS GOODS AND PRECAUTIONS TO BE TAKEN WHILE HANDLING DANGEROUS GOODS- REG |
|
TD/TM/GEN-80(IV)/1329 |
22 June 2023 |
Paradip Port Authority |
Notification of dangerous goods |
|
GPPL/MAR/01/2023 |
21 June 2023 |
APM Terminals Pipavav |
Non-Weather Working Days |
|
21-06-2023 |
21 June 2023 |
Kandla Port Steamship Agents Association |
Implementation of Shore Crane hire charges at CJ-2, 3 and 10: reg. |
|
APSEZL/04/2023 |
17 June 2023 |
APSEZ Mundra |
Non-Weather Working Days |
|
16-06-2023 |
16 June 2023 |
APM Terminals Pipavav |
Cyclone Biparjoy impacts the APM Terminals Pipavav port operations
adversely. Update III – Resumption of Land Side operations |
|
AP(D)PL/04/2023 |
09 June 2023 |
Adani Petronet (Dahej) Port Ltd |
non working days
|
|
NMPA/Traffic Dept/DTM/TMC/2023/1306 |
08 June 2023 |
New Mangalore Port Authority |
Mandatory usage of one HMC for any vessel handled at Berth No2,3 and 4-Reg. |
|
APSEZ/FS/R24/2023-24 |
01 June 2023 |
Adani Ports and Special Economic Zone Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices
|
|
TM/196/2023/00768 |
01 June 2023 |
mormugao port authority |
PUC Certificate in RFID portal |
|
AHPL/FS/R24/2023-24 |
01 June 2023 |
Adani Hazira Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
DCPL/FS/R24/2023-24 |
01 June 2023 |
The Dhamra Port Company Limited |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices
|
|
AP(D)PL/FS/R24/2023-24 |
01 June 2023 |
Adani Petronet (Dahej) Port Pvt. Ltd. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
MIDPL/FS/R24/2023-24 |
01 June 2023 |
Marine Infrastructure Developer Pvt Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices
|
|
AKPL/FS/R24/2023-24 |
01 June 2023 |
Adani Krishnapatnam Port Ltd |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
JNP/TRAFFIC/UEOMT/SWB&CB PPP/2023/1548 |
26 May 2023 |
Jawaharlal Nehru Port Authority |
Transfer of Shallow water berths and coastal berth to Nhava Sheva Distribution Terminal Pvt Ltd |
|
Mrn/HMP/F/2/138 |
24 May 2023 |
SYAMA PRASAD MOOKERJI PORT, KOLKATA |
NOTICE REGARDING BAJ BAJ MOORING |
|
Security advisory-deendayal port |
24 May 2023 |
Deendayal port authority |
SECURITY ADVISORY FOR SHIP MASTERS |
|
AP(D)PL/03/2023 |
22 May 2023 |
Adani Ports and Logistics Dahej |
Monsoon Period |
|
JSW JPL/IMS/MAR/13 |
20 May 2023 |
JSW Jaigarh Port Ltd |
REVISED INWARD PILOT MEMO |
|
MD/GL/I-5-2015/646 |
18 May 2023 |
Paradip Port Authority |
Prohibition of disposal of all kinds of garbage in water. |
|
DC/C-SH/2023/1514 |
02 May 2023 |
Mumbai Port Authority |
Monsoon Preparedness |
|
Berth Parameters |
02 May 2023 |
APSEZL MUNDRA |
MONTHLY DRAFT DECLARATION - MAY - 2023 |
|
DC/C-SH//2023/1516 |
02 May 2023 |
Mumbai Port Authority |
Availability of anchorages during monsoon period 2023 |
|
DC/C-SH/2023/1515 |
02 May 2023 |
Mumbai Port Authority |
Cold Moves |
|
B2/213/2023/T |
28 April 2023 |
Chennai Port Authority |
Scale of rates-Annual escalation factor of 12.12% to be effected from 01.05.2023 |
|
DC/C-Cir/23/1441 |
25 April 2023 |
Mumbai port authority |
NOC of immigration facility for vessel sailing out of Mumbai port |
|
FA/eOffice/558 |
24 April 2023 |
Paradip Port Authority |
Revised Annual Indexation Factor for FY 2023-24. |
|
53/2/2023-24/TGA.4 |
24 April 2023 |
NEW MANGALORE PORT AUTHORITY |
Annual Escalation factor to the extent of 60% of the variation in the Wholesale Price Index (WPI) for indexation of Royalty under the stevedoring and Shore handling Policy, 2016- reg. |
|
TM/Z-1/03 |
18 April 2023 |
Mumbai Port Authority |
Wharfage rate for Jawahar Dweep 5 (JD5) and indexation thereof |
|
APSEZ/FS/R21/2023-24 |
16 April 2023 |
Adani Ports and Special Economic Zone Ltd, Mundra |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
TD/TM/P&L-27/2021(PT-IV)/761 |
12 April 2023 |
Paradip Port Authority |
Indexation and payment of royalty by the stevedoring and shore handling agents |
|
DRAFT DECLARATION 05.04.2023 |
05 April 2023 |
APSEZL MUNDRA |
MONTHLY DRAFT DECLARATION - APRIL - 2023 |
|
APSEZ/FS/R20/2023-24 |
01 April 2023 |
Adani Ports and Special Economic Zone Ltd, Mundra |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
TD/TM/GEN-264/673 |
28 March 2023 |
Paradip Port Authority |
Indexation of tariff caps fixed in the Reference tariff cases under 2013 guidelines for PPP projects at the major trust with reference to the variation in Wholesale Price Index (WPI) |
|
MD/SPG/I-09/2019/287 |
02 March 2023 |
PARADIP PORT AUTHORITY |
Circulars regarding deficiencies. |
|
TD/TM/GEN-201(PT-1)/443 |
01 March 2023 |
Paradip Port Authority |
Berthing Policy for FY 2023-24 |
|
APSEZL/Marine/03/2023 |
28 February 2023 |
Adani Ports and Logistics |
Revised Pilotage charges and Port Env. Protection safety and Dredging charges |
|
AHPL/Marine/01/2023 |
20 February 2023 |
Adani Hazira Port Ltd. |
Guidelines on compliance with MARPOL Annex VI |
|
AGPL/MAR/CIR/2022-23/034 |
20 February 2023 |
Adani Gangavaram Port Ltd. |
GUIDELINES ON COMPLIANCE WITH MARPOL ANNEX VI |
|
MD/SHS/TECH-26/2023/186 |
10 February 2023 |
PARADIP PORT AUTHORITY |
MAXIMUM PERMISSIBLE LOA, BEAMS AND DRAFT OF VESSELS AT DIFFERENT BERTHS OF PARADIP PORT |
|
MD/SHS/TECH-26/2023/186 |
10 February 2023 |
Paradip port authority |
Maximum permissible LOA, Beam and draft of vessels at different berths of paradip port. |
|
MR/TA/KPSAA/OPEN-LOOP/23/02 |
07 February 2023 |
Deendayal port authority |
DGS. Circular no.2 of 2023 |
|
MD/SPG/I-78/2009(Pt.II)/137 |
03 February 2023 |
PARADIP PORT AUTHORITY |
circular |
|
Berth Parameters February 2023 |
01 February 2023 |
Adani Ports and Logistics |
APSEZL MUNDRA MONTHLY DRAFT DECLARATION - FEBRUARY - 2023 |
|
NMPA/TM/IOF/2023 |
25 January 2023 |
New Mangalore Port Authority |
Calculations of SOP |
|
NMPA/TM/IOF/2023 |
25 January 2023 |
New Mangalore Port Authority |
Draft Standard Operating Procedure (SOP) For export of Iron Ore Fines from NMPA-Reg |
|
NMPA/TM/IOF/2023 |
25 January 2023 |
New Mangalore Port Authority |
Draft Standard Operating Procedure (SoP) for Export of Iron Ore fines from NMPA-Reg (Draft SOP) |
|
TF/SH/Berthing policy/Corresp./2019-II/207 |
25 January 2023 |
Deendayal Port Authority |
Amendment in Berthing Policy |
|
ITRA/SHP/FMISC/1560 |
23 January 2023 |
Visakhapatnam Port Authority |
Redefinition of vessels dimensions for working at inner harbour of VPA-reg |
|
TM/A/15-22/46 |
13 January 2023 |
Mumbai Port Authority |
Pre-shipment facility for storage of export cargo |
|
1/2/2014-DTM(C)/2023-1 |
09 January 2023 |
New Mangalore Port Authority |
Additional rebate on Vessels Related Charges to Mainline and Feeder Line Container Vessels calling to NMPA, other than originating from Indian Ports and Colombo. |
|
1/2/2014-DTM(C)/2023-I |
09 January 2023 |
New Mangalore Port Authority |
Extension of rebate for Vessel Related Charges to Mainline Container vessels and Feeder Line Container vessels w.e.f. 01.01.2023 to 31.12.2023. |
|
QC/PHECP/2023106 |
03 January 2023 |
Cochin Port Authority |
Resurqence of Covid-19 Disease - req. |
|
Cir.1/PHO/2023 |
02 January 2023 |
Krishnapatnam Port |
Resurgence of Covid-19 Pandemic |
|
PHO/Cir/2023/732 |
02 January 2023 |
Chennai Port Authority |
Resurgence of Covid-19 Pandemic |
|
JSWJPL/05.01.2023 |
01 January 2023 |
Jaigarh Port Ltd. |
Trade Circular - 01/2023 |
|
AGPL/MAR/CIR/2022-23/023 |
01 January 2023 |
Adani Ports and Logistics- Gangavaram Port |
Revised fuel surcharge |
|
MIDPL/FS/R14/2022-23 |
01 January 2023 |
MIDPL Kattupalli Port |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
JSW/JPL/IMS/Marine/52 |
01 January 2023 |
Jaigarh Port Ltd. |
Covid-19 Declaration |
|
AKPL/FS/R14/ 2022-23 |
01 January 2023 |
Adani Ports and Logistics- Krishnapatnam Port |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
DPCL/FS/R14/2022-23 |
01 January 2023 |
Adani Ports and Logistics- Dhamra Port |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AP(D)PL/FS/R14/2022-23 |
01 January 2023 |
Adani Ports and Logistics- Dahej. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AV-29017/5/2020-DT |
30 December 2022 |
Office Memorandum from Ministry of Civil Aviation |
Resurgence of Covid-19 Pandemic |
|
FA/COST/1071/REV.SOR |
28 December 2022 |
Deendayal Port Authority |
General Revision of Scale of Rates of DPA |
|
mmpt_2023 |
27 December 2022 |
Gulf of Kutch: MMPT (Adani Ports , Mundra) |
Tide table for 2023 |
|
JSWJPL/25-12-2022 |
25 December 2022 |
JSW JAIGARH PORT |
MBC's & Harbour crafts Inbound / Outbound following proper navigational channel |
|
B2/97/2022/T |
23 December 2022 |
Chennai Port Authority |
Revised Scale of Rates |
|
TM/A/15-22/45 |
23 December 2022 |
Mumbai Port Authority |
MbPA : Concessions for export of all agricultural products like Sugar, Rice, Soyabean Meal, Wheat, Maize etc. |
|
Z.28015/182/2021-DMCELL |
22 December 2022 |
Ministry of Health and Family welfare |
Resurgence of Covid-19 Pandemic |
|
TN/CCN/467/2012-14 |
21 December 2022 |
CHENNAI PORT AUTHORITY |
Revision of Scale of Rates |
|
FA/COST/1201-(SOR) |
21 December 2022 |
DEENDAYAL PORT AUTHORITY |
SCALE OF RATES |
|
GAD/P/GM-PH/5179 |
21 December 2022 |
Mumbai Port Authority |
HOLIDAY LIST 2023 |
|
HSE Code of Conduct |
19 December 2022 |
JSW Jaigarh Port Ltd. |
HSE Code of Conduct-2021 |
|
Trade Circular 19 / 2022 |
19 December 2022 |
JSW JAIGARH PORT LTD |
Required Safety Equipment |
|
CIRCULAR-19.12.2022 |
19 December 2022 |
The Gandhidham Chambers of Commerce and Industry |
Charter party holidays for the year 2023 |
|
GPL/MAR/CIR/2022-23/022 |
16 December 2022 |
Adani Ports and Logistics- Gangavaram |
Revised fuel surcharge |
|
TN No. 156 |
16 December 2022 |
DP world |
Shifting Charge |
|
APSEZL/FS/R13/2022-23 |
16 December 2022 |
APSEZL Mundra. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
Port Warning No-02 |
15 December 2022 |
India Meterological Department , GOI |
Deep Depression over Eastcentral and adjoining Southeast Arabian Sea. |
|
GMB/POP/T/Control Room Signal/09 |
14 December 2022 |
Gujarat Maritime Board (Government of Gujarat) |
Port Warning: Signal- 1 |
|
Port Warning No-01 |
14 December 2022 |
India Meteorological Department, GOI |
Depression over Eastcentral and adjoining Southeast Arabian Sea. |
|
AKPL/MARINE/18/2022 |
12 December 2022 |
Adani Krishnapatnam Port Ltd. |
Non weather working days |
|
BPCL/JNP/OPS/02 |
08 December 2022 |
Bharat Petroleum Corporation |
Shutdown of Jetty operations at LB02. |
|
BPCL/JNP/OPS/02 |
08 December 2022 |
Bharat Petroleum Corporation Ltd. |
Trade Notice |
|
AKPL/MARINE/17/2022 |
06 December 2022 |
ADANI KRISHNAPATNAM PORT LTD. |
Non weather working day |
|
AKPL/MARINE/17/2022 |
06 December 2022 |
Adani Krishnapatanam ports Ltd |
Non-weather working day |
|
DPCL/FS/R12/2022-23 |
01 December 2022 |
Adani Ports and Logistics: Dhamra port |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AKPL/FS/R12/ 2022-23 |
01 December 2022 |
Adani Ports and Logistics- Krishnapatnam |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
Berth Parameters December 2022 |
01 December 2022 |
Adani Ports and Logistics Mundra |
APSEZL MUNDRA MONTHLY DRAFT DECLARATION - DECEMBER - 2022 |
|
AP(D)PL/FS/R12/2022-23 |
01 December 2022 |
Adani Ports and Logistics Dahej |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
APSEZL/FS/R12/2022-23 |
01 December 2022 |
APSEZL Mundra. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices
|
|
MIDPL/FS/R12/2022-23 |
01 December 2022 |
MIDPL Kattupalli Port |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AHPL/FS/R12/2022-23 |
01 December 2022 |
Adani Hazira Port Ltd. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
NMPA/DC/Per.Draft/2022-23/03 |
29 November 2022 |
New Mangalore Port Authority |
Increase in Draft at berth No.16 to 14m at 1m tide at New Mangalore Port |
|
IPA/ICTD/DELIVERABLE/NLP MARINE/10/2022 |
29 November 2022 |
Indian Ports Authority |
Sunsets of PCS1X and Go-Live of National logistics portal- marine (NLP-m) |
|
NMPA/FIN /2022-23 |
28 November 2022 |
New Mangalore Port Authority |
Revision of Scale of Rates effective from 25th December 2022 |
|
FA/COST/1204/104 |
28 November 2022 |
Deendayal Port Authority |
Extend validity of existing scale of rate of Deendayal port authority |
|
NMPA/FIN/REV/ 2022-23/5164 |
22 November 2022 |
New Mangalore Port Authority |
General revision of Scale of Rates |
|
T.O (sh & CH)/10/1834 |
22 November 2022 |
SYAMA PRASAD MOOKERJEE PORT, KOLKATA |
Onboard handling of Iron and steel scrap and pig iron with ship's crane through stevedoring and shore handling agents |
|
NMPA/FIN/REV/2022-23/5164 |
22 November 2022 |
New Mangalore Port Authority |
General revision of Scale of Rates |
|
MIDPL/FS/R11/2022-23 |
16 November 2022 |
MIDPL KATTUPALLI PORT |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AKPL/FS/R11/ 2022-23 |
16 November 2022 |
ADANI PORTS AND LOGISTICS- KRISHNAPATNAM |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AP(D)PPL/FS/R11/2022-23 |
16 November 2022 |
ADANI PORTS AND LOGISTICS- DAHEJ |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
AHPL/FS/R11/2022-23 |
16 November 2022 |
ADANI HAZIRA PORT LTD. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices
|
|
DPCL/FS/R11/2022-23 |
16 November 2022 |
ADANI PORTS AND LOGISTICS-DHAMRA |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
GPL/MAR/CIR/2022-23/020 |
16 November 2022 |
GANGAVARAM PORT LTD. |
Revised Fuel Surcharge |
|
TF/SH/DREDGING/1350 |
07 November 2022 |
Deendayal port authority |
Withdrawal of Cargo Jetty No.2 for Maintenance Dredging work |
|
TF/SH/Dredging/1350 |
07 November 2022 |
DPA Kandla Port AUthority |
Port Circular from DPA Kandla for withdrawal of Cargo Jetty No.2 from 12/11/22 to 17/11/2022 for maintenance/dredging work.
Based on the above, the berthing delays may be increased for dry cargo vessels in coming days. |
|
JSWJPL/04-11-2022 |
04 November 2022 |
JSW PORT AUTHORITY |
ADDTIONAL PILOTAGE CHARGE BASED ON VESSEL AGE |
|
ITRA/SHP/FNWW |
31 October 2022 |
Vishakhapatnam Port Authority |
Declaration of Non-Weather working days on 14th and 15th October 2022- reg |
|
TN No.154 |
31 October 2022 |
DP WORLD |
Free dwell time for Import/ Export laden containers |
|
BCPL/JNP/OPS/02 |
27 October 2022 |
Bharat Petroleum Corporation LTD |
Liquid Cargo Jetty |
|
BPCL/JNP/ops/02 |
27 October 2022 |
BPCL - Liquid Cargo Jetty |
Structural repair work of fenders and fire fighting system repair work at BPCL LCJ LB01-Shut Down of Jetty |
|
TM/02/12/2022/748 |
25 October 2022 |
Mormugao Port Authority |
Rationalization of Tariff for cruise vessels arriving in India |
|
Trade Circular No. 1527 |
18 October 2022 |
Visakhapatnam Port Authority |
Declaration of Non-weather working days from 3rd Oct to 10th Oct 2022 |
|
BPTS/MUN/02 |
15 October 2022 |
Adani Ports and Logistics, Mundra |
Berthing Policy and Tariff Structure |
|
KRI/02/w. e. f. 0001hrs/15th Oct’ 2022 |
15 October 2022 |
Adani Port and Logistics Krishnapatinam Port |
Berthing Policy & Tariff Structure |
|
Circulars No. 1523 |
12 October 2022 |
Visakhapatnam Port Authority |
Rationalization of tariff for cruise vessels arriving in India - Reg. |
|
ITRA/REV/Flron Ore |
12 October 2022 |
Visakhapatnam Port Trust |
Vacation of license plots allotted for stacking of Export lron Ore from VPA - Reg |
|
Trade Notice No. 07/2022 |
11 October 2022 |
Mormugao Port Authority |
Concessional on handling Gypsum Cargo through non RR rakes - reg.
|
|
Trade Notice No. 06/2022 |
11 October 2022 |
Mormugao Port Authority |
Concessional Tariff, Common Circulars - Reg |
|
Trade Notice No. 08/2022 |
11 October 2022 |
Mormugao Port Authority |
Concessional on handling Bauxite Cargo through non RR rakes - Reg |
|
GPL/MAR/CIR/2022-23/014 |
01 October 2022 |
Gangavaram Port Ltd. |
Revised Fuel Surcharge |
|
DRAFT DECLARATION |
01 October 2022 |
APSEZL MUNDRA |
APSEZL MUNDRA MONTHLY DRAFT DECLARATION - OCTOBER - 2022 |
|
Trade Circular No 1514 |
26 September 2022 |
Vizag Port Authority |
Amendment of certain clauses with an objective to increase the productivity of dry bulk vessels calling at Vizag Port Inner Harbour. |
|
APSEZL/Marine/07/2022 |
24 September 2022 |
APSEZL Mundra |
Additional Pilotage Charges based on Age Of the Vessels |
|
1/2/2019-20/DTM(O/R) |
19 September 2022 |
New Mangalore Port Authority |
Shifting of vessel for port convenient from Berth No.8 to any other Berths and vice-versa |
|
GPL/ MAR/ CIR/ 2022-23/ 012 |
16 September 2022 |
Gangavaram Port Ltd. |
Revised Fuel Surcharge |
|
APSEZL/FS/R7/2022-23 |
16 September 2022 |
Adani Ports and Logistics- Mundra |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
Draft Deleration |
15 September 2022 |
APSEZL MUNDRA |
MONTHLY DRAFT DECLARATION - SEPTEMBER - 2022 |
|
APSEZL MUNDRA MONTHLY DRAFT DECLARATION - SEPTEMBER - 2022 |
01 September 2022 |
Mundra- Adani ports and logistics |
APSEZL MUNDRA MONTHLY DRAFT DECLARATION - SEPTEMBER - 2022 |
|
DPL/Marine/02/2022 dated 30th May 2022 |
01 September 2022 |
Dighi Port Adani Port & Logistics |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
GPL/ MAR/ CIR/ 2022-23/ 011 |
01 September 2022 |
Gangavaram port limited |
Revised fuel surcharge |
|
JSWJPL/01-09-2022 |
01 September 2022 |
Jaigarh port limited |
Trade circular-15/2022 |
|
AKPL/FS/R6/ 2022-23 |
01 September 2022 |
Krishnapatnam- Adani ports and logistics |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices |
|
covid-19 SOP |
01 September 2022 |
Jaigarh port limited |
Covid-19 SOP |
|
APSEZL/FS/R6/2022-23 |
01 September 2022 |
Mundra-Adani ports and logistics |
Revision of fuel surcharges w.e.f. 01.09.2022 |
|
APSEZL/FS/R5/2022-23 |
16 August 2022 |
APSEZL Mundra. |
Revision in “Fuel Surcharge on Pilotage” due to changes in fuel prices
|
|
gpl/mar?cir/2022-23/009 |
09 August 2022 |
Gangavaram Port Ltd. |
Declaration of Non Weather Working Day |
|
TF/SH/BerthingPolicy/Corresp/2019-11/680 |
28 July 2022 |
Deendayal port authority |
PFA New Comprehensive berthing Policy issued by the Traffic Manager, DPA, Kandla fyki and perusal please |
|
M.P/76-86/2022 |
20 July 2022 |
PORT HEALTHORGANISATION, MUMBAI |
CIRCULAR REGARDING MONKEY POX |
|
NOTIFICATION No. 56/2022-Customs (N.T.) |
30 June 2022 |
MINISTRY OF FINANCE (Department of Revenue) (CENTRAL BOARD OF INDIRECT TAXES AND CUSTOMS) |
The MOF GOI Notification Vide No:56/22-Customs(N.T) Dated 30/06/2022,
The regulations may be called the Sea Cargo Manifest and Transhipment (First Amendment) Regulations, 2022 - SCMTR implementation extended till 31st December,2022. |
|
Berthing Guidelines Circular |
29 June 2022 |
Jawaharlal Nehru Port Trust |
Berthing Guidelines Circular |
|
No. TF/SH/Dredging/519 |
28 June 2022 |
Deendayal Port Authority |
Withdrawal of Oil Jetty No. 2 & 3 for Dredging Work - reg.
|
|
General Instructions |
27 June 2022 |
Paradip Port Authority |
Trade circular received from Paradip Port Authority, regarding general instructions - 2022 to all vessels calling at Paradip Port. |
|
GMB/POP/T/Control Room Signal/01 |
27 June 2022 |
Gujarat Maritime Board |
Port has hoisted SIGNAL LOCAL CAUTIONARY III (LCS-III) at Porbunder Port until further notice.
|
|
DC/DEMC/Circular?234 |
22 June 2022 |
Mumbai port Trust |
prohibition of Single Use Plastic in Mumbai Port Authority |
|
Trade Notice |
18 June 2022 |
Kandla Port Steamship Agents Association |
Withdrawal of Oil Jetties for purpose of Dredging & Maintenance. |
|
FD/Costing/SoR/Maritime Service Charges/2020 |
10 June 2022 |
Cochin Port Trust |
Waiver of Port charges for the Maritime Services for ships taking bunker supply at the outer anchorage of Cochin Port |
|
Trade Circulars |
10 June 2022 |
Cochin Port Trust |
Waiver of Port charges for the Maritime Services for
ships taking bunker supply at the outer anchorage of Cochin Port |
|
New Mangalore port Authority |
07 June 2022 |
No. NMPA/TM/2022-23/Gen |
Extension of rebate of 30% on Vessels Related Charges (Port Dues & Pilotage) for Cape Size Vessels (GRT above 80000) calling at B.No.16. |
|
APSEZL Mundra |
02 June 2022 |
APSEZL Mundra |
APSEZL Mundra Monthly Draft Declaration - June 2022 |
|
F.No. 1-1/(2022)-SP-I |
24 May 2022 |
Directorate of Sugar and Vegetable oil |
Regulation regarding export of raw, white and refined sugar under OGL in the current sugar season 2021-22(Oct-Sep) |
|
DPCL/TRADE/04/2022 |
24 May 2022 |
Adani Dhamra Port |
Fuel Surcharge due to recurrent hike in the fuel prices |
|
TF/SH/Dredging /346 |
24 May 2022 |
Deendayal Port Authority |
Withdrawal of oil jetty no. 4 for repairing work -reg. |
|
Circular No.: AHPL/Marine/03/2022 |
24 May 2022 |
Adani Hazira Ports |
Fuel Surcharge due to recurrent hike in the fuel prices
|
|
DC/S(21)/2022/04 |
20 May 2022 |
Mormugao Port Authority |
The Maximum permissible draft |
|
No. TM/A15/08 |
12 May 2022 |
Mumbai Port Authority |
Handling of Calcite Chips at Mumbai Request for storage facilities. |
|
Trade Circular 1477 |
11 May 2022 |
Visakhapatnam Port Authority, Traffic Deparment |
Reorientation of Berth Nomenclature at Visakha Container Terminal(VCTPL) in light of Commencement of their New Terminal - Reg. |
|
No. MR/PS/3023/GEN.CORR/23020-23/ |
10 May 2022 |
DEENDAYAL PORT AUTHORITY |
REQUIREMENTS TO BE FULFILLED BY THE TANKERSVISITING
VADINAR S.B.Ms |
|
TF/SH/BerthingPolicy/Corresp/2019-II/278 |
10 May 2022 |
Deendayal Port Authority |
Amendment to certain clauses in the existing Berthing Policy - reg |
|
TO(Sh&CH)/10/680 |
10 May 2022 |
Syama Prasad Mookerjee Port, KolKata |
Suspension of operations at Berth No. 16/ (O) [erstwhile HOJ-I] of HDC, SMP for a Period of 45 days with effect from 25.06.2022 |
|
Circular No PC/Traffic/Weather Report/2022, |
09 May 2022 |
ANDHRA PRADESH MARITIME BOARD GOVERNMENT OF ANDHRA PRADESH. |
It is to inform that the Meteorological Department, Govemment of India has
released special Message on 08.05.2022 duly stating that cyclone is very likely to recurve
north-north east wards an move towards Northwest Bay of Bengal off Odisha coast. It is
likely to weaken gradually into a Cyclonic Storm during next 36 hours around 12.30 hours
of 09.05.2022.
|
|
APSEZL/Marine/04/2022 |
07 May 2022 |
Adani Port and Logistics APSEZL, Mundra |
Intimation to the trade regarding construction work at MMPT terminal T2 |
|
TF/SH/Dredging/229 |
05 May 2022 |
DEENDAYAL PORT AUTHORITY |
Withdrawal of Oil Jetty no. 2 for repairing worl - reg. |
|
TF/SH/Dredging/229 |
05 May 2022 |
Deendayal Port Authority |
Withdrawal of Oil Jetty No. 2 for repairing Work-reg. |
|
ACL/BCT/MUL/COMM/05/2022/11 |
02 May 2022 |
Muldwarka Port |
Revision of Port Muldwarka Terminal tariff. |
|
Circular - 1472 |
29 April 2022 |
Visakhapatnam Port Trust |
SOR indexation to inflation in WPI - Implementation of 10.77%/6.46% escalation announced by IPA - Reg |
|
TF/SH/Dredging |
28 April 2022 |
Deendayal Port Authority |
Withdrawal of CJ No. 10 for Maintenance and dredging work - reg |
|
JNP/FIN/REV-CT/Mbpa/22-23/1211 |
26 April 2022 |
JAWAHARLAL NEHRU PORT AUTHORITY |
Revised Scale of Rates w.e.f. 01st May 2022 |
|
No. NMPA/FIN/2022-23 |
25 April 2022 |
New Mangalore Port Authority |
Increase in Scale of Rates (SOR) towards Cargo Related Charges w.e.f 1st May 2022 to 30th Apr- Reg |
|
NMPA/FIN/2022-23 |
25 April 2022 |
New Mangalore Port Authority |
Increase in Scale of Rates (SOR) towards Container Scanning Charges w.e.f 1st May 2022 to 30th April 2023 - Reg
9 |
|
FA/COST/125/2022/24 |
21 April 2022 |
Marmugao Port Authority |
Increase in scale of rates (SoR) towards Vessel Related Charges and Cargo related Charges w.e.f 1st may 2022 to 30th April 2023-Reg |
|
TM/D/4-3/5 |
19 April 2022 |
Mumbai Port Authority |
Revised Comprehensive Scale of Rates of Mumbai Port Authority effective from 01.05.2022 |
|
TM/P/19-15/03 |
08 April 2022 |
Mumbai Port Authority |
Revised System Procedures {SP} for New/Renewal of Registration for issuance of Dock Entry
Permits (DEPs) - 2O22 |
|
Trade Circular No. 1466 |
08 April 2022 |
Visakhapatnam Port Authority |
Priority Berthing of vessel intending to load export Wheat in VPA - Reg. |
|
TO(Sh&CH)/10/469 |
02 April 2022 |
SYAMA PRASAD MOOKERJEE PORT,KOLKATA |
Suspension of operations at B/17(O){erstwhile HOJ-II) of HDC,SMP for 45 days w.e.f 03.05.2022 |
|
APSEZL/Marine/03/2022 |
01 April 2022 |
APSEZL Mundra. |
Amendment in stevedoring tariff and mineral water supply charges applicable w.e.f. 1.5.2022. |
|
BPTS/MUN/01 |
01 April 2022 |
Adani Ports and Sez Ltd. Mundra |
Berthing Policy & Tariff Structure |
|
DRAFT DECLARATION - APRIL-2022 |
01 April 2022 |
APSEZL MUNDRA |
APSEZL MUNDRA MONTHLY DRAFT DECLARATION - APRIL-2022 |
|
TN No. 138 |
01 April 2022 |
DP World |
Free time for Export/Import laden containers. |
|
No. Tfc/GI-252/SOR |
31 March 2022 |
Syama Prasad Mookerjee Port Kolkata |
Trade circular on Scheme for rebate for Vessel as well as Cargo Related Charges for handling Dry Bulk Cargo at Syama Prasad Mookerjee Port Kolkata ( i.e. : Haldia & Kolkata Port ).
|
|
AP(D)PPL/02/2022 |
30 March 2022 |
Adani Terminal, Dahej |
Adani jetty will be not available for berthing/unberthing of vessel from 08.04.22 to 12.04.22 for maintenance and dredging work.
|
|
E1/46/2019/TO |
30 March 2022 |
CHENNAI PORT AUTHORITY |
Revised rates for deployment of MHCs from 01.04.2022 - Trade Notice - Reg. |
|
No.1/2/2019-20/DTM(O/R)part1 |
29 March 2022 |
New Mangalore Port Authority |
Standard Operating Procedure for Berth allotment at NMP |
|
MIDPL/TC/02/2022 |
29 March 2022 |
Kattupali port |
AKPL with regards to change of port tariff revision. (Adani Kattupalii) |
|
NMPT/TM/berth.14/2022 |
28 March 2022 |
New Mangalore Port Authority |
Operationalization of Berth no.14 for handling of containers and other cargo on DBFOT basis at NMPA by M/s JSW MCTPL |
|
GCB/TO/S/3/62 |
28 March 2022 |
Syama Prasad Mookerjee Port, Kolkata |
Haldia port authority regarding 1 no. MHC ( Shore crane) will be decommissioned at OLD Berth no.8 ( mentioned as New berth No.9 in the circular) for maintenance from 3rd April to 30th April 2022. During this period with only 1 MHC , discharge rate expected to be around 8000 to 10000 mt per day agw wp at this Berth. |
|
MNPT/TM/BERTH.14/2022 |
28 March 2022 |
New Mangalore Port Authority |
Operationalization of Berth No.14 for handling of containers and other cargo on DBFOT basis at NMPA by JSW
|
|
GCB/TO/S/3/62 |
28 March 2022 |
SYAMA PRASAD MOOKERJEE PORT, KOLKATA |
Haldia port authority regarding decommissioning of 1 no. MHC (shore crane) at OLD Berth no.8 (mentioned as New berth No.9 in the circular) for maintenance from 3rd April 2022 to 30th April 2022. During this period with 1 MHC available working (out of 2) , discharge rate expected to be around 8000 to 10000 mt per day agw wp at this Berth. |
|
Trade Circular 07" |
24 March 2022 |
JSW Jaigarh Port Ltd. |
Regarding COVID Guidelines in JSW Jaigarh Port Ltd. This circular will supersede the guidelines for Covid-19 under Trade Circular 03/2022 dated 18.01.2022.
|
|
Trade Notice No. 03/2022 |
24 March 2022 |
Cochin Port Trust |
Rebate on vessel related charges for Container vessels at ICTT. |
|
No.TF/SH/Circulars/2022/5620 |
24 March 2022 |
Deendayal Port Trust |
Handling restriction of Timber Logs at Cargo Jetty - 2,3 and 10 - reg.
|
|
No.Pt.TF/SH/Berthing Policy/2020/5596 |
17 March 2022 |
Deendayal Port Trust |
Productivity Norms for new cargo as per Berthing policy - reg. |
|
Circular No. 1460 |
17 March 2022 |
Visakhapatnam Port Trust |
Concession in railway terminal charges in respect of mechanically tippled iron ore trains handled at ore handling plant (OHP) operated by M/s EVTL & for manual iron ore racks at VPT - Reg. |
|
Trade notice: AP(D)PPL/01/2022 |
17 March 2022 |
Adani Ports Mundra |
Revision of Port Tariff with effect from 01st of April 2022 |
|
APSEZL/Marine/02/2022 |
16 March 2022 |
Adani Port & Logistics Mundra |
Reference bank to be used for dollar conversion - HDFC Bank TT Selling Rate |
|
CIRCULAR No-1457 |
16 March 2022 |
VISAKHAPATNAM PORT AUTHORITY, TRAFFIC DEPARTMENT |
Sub: Continuation of discounted rates in license fee for allotment of Land for a
period of not more than 11 months as per the Land Policy Guidelines for
Major Ports 2014 at SOR rates notified by TAMP - Reg.
Ref:1. This office circular No.1371, dt. 15.04.2021.
2. This office Circular No. 1403, dt.09.09.2021. |
|
CIRCULAR NO-1458 |
16 March 2022 |
VISAKHAPATNAM PORT AUTHORITY , TRAFFIC DEPARTMENT |
Compliance of coverage of cargo stacks at the license plot altotted by VPT for storage /stacking of EXIM cargo - Reg.
|
|
APSEZL/Marine/02/2022 |
16 March 2022 |
Adani ports and logistics APSEZL Mundra, |
Reference bank to be used for dollar conversion - HDFC Bank TT Selling Rate |
|
"Trade Circular - 05 / 2022 |
14 March 2022 |
Jaigarh Port Ltd |
Regarding Vessel Sanitization". of JSW Jaigarh port. |
|
No. TF/SH/SOR/5580 |
14 March 2022 |
DEENDAYAL PORT AUTHORITY |
Circular |
|
TF/SH/SOR/5580 |
14 March 2022 |
Deendayal Port Authority |
Shifting the vessel working at IFFCO Jetty to OTB/Inner Anchorage/Other Oil Jetties in Port Account |
|
06/2022 |
14 March 2022 |
Jaigarh Port Ltd. |
"Trade Circular - 06 / 2022 regarding Indian Flag" of JSW Jaigarh port. |
|
TD/TM/GEN-211(PT-1)/434 |
11 March 2022 |
Paradip Port Trust |
OFFICE ORDER |
|
No TM/A/15-31 /98 |
11 March 2022 |
MUMBAI PORT AUTHORITY |
(i)Storage facilities for import agricultural products and concessional storage upto 60 days, inside Docks at 12A ID, 12B ID, Temporary Shed at 12B ID and upto 180 days at Outlying Areas.
(ii) Storage facility for import Ammonium Sulphate |
|
NO. TD/TM/GEN-20(PT-1)/2020-21/433 |
11 March 2022 |
Paradip Port Trust |
Berthing Policy for 2022-23 (WEF 01.04.2022 to 31.03.2023) |
|
No.MR/SH/1120 |
10 March 2022 |
DEENDAYAL PORT AUTHORITY |
Permissible Draught for ships and Tankers at Deendayal Port for the month April to June 2022 |
|
TF/SH/DPT-HMC/CME-COREESP/2020/5519 |
09 March 2022 |
DEENDAYAL PORT AUTHORITY |
Tandem Operations with Liebherr make Harbour Mobile Cranes[HMCs]-Reg |
|
APKL/Marine/11/2022 |
01 March 2022 |
Adani Ports and Logistics |
Amendment in Tariff Structure of Krishnapatinam Port |
|
DRAFT DECLARATION |
01 March 2022 |
APSEZL MUNDRA |
APSEZL MUNDRA MONTHLY DRAFT DECLARATION - MAR-2022
|
|
NO.TM/M-9/95 |
21 February 2022 |
Mumbai Port Authority |
Ease of doing Business For Car Carrier Vehicles. |
|
APSEZL/Marine/02/2022 |
19 February 2022 |
APSEZ Mundra |
Amended S.O.P. ON CREW CHANGES OF SEAFARERS AT MUNDRA PORT |
|
APSEZL/Marine/01/2022 |
18 February 2022 |
APSEZL Mundra. |
Revision in Marine Tariff structure, APSEZL Mundra |
|
No.PHOK/Circular/Covid-19. |
16 February 2022 |
PORT HEALTH ORGANISATION, KANDLA |
Guidelines circulated by the Govt. of India, Ministry of Health and Family Welfare, on 10th February, 2022, the following amended SOP would be implemented for sign-on/sign- off crew of both Indian and foreign nationality at Deendayal Port Trust, Kandla and at various minor ports of Gujarat |
|
स/No.Circular/Covid-19/2022 |
14 February 2022 |
PORT HEALTH ORGANIZATION, Vizag |
Guidelines for International arrivals of the Ministry of Health and Family Welfare, Government of India, dated 10th February 2022 & effective from 00.01 hrs on 14 th February 2022, the following amended SOP would be implemented for sign-on/sign-off crew of both Indian and foreign nationality at Visakhapatnam Seaport with immediate effect |
|
NO. PHO-C?COVID-19/2022/401 |
14 February 2022 |
Port Health Organisation, Chennai |
SOP for Crew Change at Chennai |
|
No. EL/AC/Tariff/Gazette/805 |
09 February 2022 |
DEENDAYAL PORT TRUST |
Port SOR for DPT shore crane charges for handling ODC/wind blades and other over dimension cargo through tandem/twin operation. Also DPT shore crane charges applicable for the ships, please refer at SOR for details. |
|
NMPT/TM/BERTH.14/2020 |
07 February 2022 |
New Mangalore Port Trust |
Pre-Intimation: Operationalization of Berth No.14 for Handling of Containers and other Cargo on DBFOT basis at NMPA by M/s/. JSW MCTPL. LTD. |
|
NMPT/TM/BERTH.14/2022 |
07 February 2022 |
New Mangalore Port Trust |
Pre- Intimation: Operationalization of Berth No. 14 for Handling of Containers and other Cargo on DBFOT basis at NMPA by M/s. JSW MCTPL. LTD. |
|
No.MR/SH/1120 |
04 February 2022 |
Deendayal port Trust |
Permissible Channel Draught for February - 2022 |
|
No. NMPT/DC/Per.Draft/2021/014 |
02 February 2022 |
New Mangalore Port Trust |
Permissible Draft |
|
Circular |
02 February 2022 |
Kandla Port Steamship Agents Association, |
SCMTR Regulations 2018- issues. |
|
Circular |
02 February 2022 |
Kandla Port Steamship Agents Association |
Circular by Dy. Conservator of 01,02.2021 related to Port dues: reg. |
|
Berth Parameters Feb 2022 |
01 February 2022 |
Adani Ports and Logistics Mundra |
APSEZL Mundra Monthly Draft Declaration - February 2022 |
|
SOP permitting foreign nationals at V.O. Chidambaranar Port. |
27 January 2022 |
V.O. Chidambaranar Port Trust |
SOP permitting foreign nationals at V.O. Chidambaranar Port. |
|
No. MAR - SHIP0GENE(CIRC)/1/2021-MarineHM/D.30 |
27 January 2022 |
V.O. Chidambaranar Port Trust |
Procedure to be followed for foreigners' visit to VOC Port - reg. |
|
Circular No. 1447 |
17 January 2022 |
Visakhapatinam Port Authority |
TARIF FOR OPERATION OF MOBILE X-RAY CONTAINER SCANNING FACILITY ( MXCSF) AT VPA - PAYMENT CHARGES - REG |
|
No. OW/P-1274/2021-22 |
17 January 2022 |
Mumbai Port Authority |
Registration of unorganized Dock Workers on e - SHRAM portal.
Re: Circular No. TM/S-1/76 dated 29.01.2021 and
TM/S-11/88 dated 14.12.2021 |
|
Predicted Tide |
14 January 2022 |
Gulf of Kutch: MMPT (Adani Ports , Mundra) |
Predicted Tide - Jan 2022 to Dec 2022 |
|
Circular |
12 January 2022 |
THE GANDHIDHAM CHAMBER OF COMMERCE AND INDUSTRY |
CHARTER PARTY HOLIDAYS FOR THE YDAR 2022 |
|
Customer Advisory |
07 January 2022 |
APMT-Pipavav |
Trade Advisory which received fm APMT-Pipavav towards the Covid-19 (Coronavirus) Business update |
|
Customer Advisory |
07 January 2022 |
Gujarat Pipavav Port Ltd.(GPPL), APM Terminals, Pipavav |
Covid 19 Business Update |
|
No. NMPT/DC/Per.DrafU2021/013 |
06 January 2022 |
NEW MANGALORE PORT TRUST |
PERMISSIBLE DRAFT |
|
APSEZL/Marine/01/2022 |
06 January 2022 |
APM Terminal Gujarat and Adani Mundra Port |
Customer Advisory with business safety update in line with present Covid situation particularly w.r.t to essential port visits and other business activities received from APM Terminal Gujarat and Adani Mundra Port. |
|
Circular 014 - Addendum to BPTS 2021-22.pdf |
03 January 2022 |
Gangavaram Port Ltd./GPL/MAR/CIR/2021-22/014 |
Addendum to "Berthing Policy & Tariff Structure"(BPTS 2021-22) |
|
JSWJPL/30-12-2021 |
30 December 2021 |
Jaigarh Port Ltd. |
New Port Tariff applicable from 01.01.2022 |
|
NMPT/DC/Per.Draft/021/012 |
27 December 2021 |
Dy, Conservator, NMPT |
The permissible draft in the approach channel and at berth no.16 (Mangalore Coal Terminal of JSW) has been increased to 14 M with 1 M height of tide with immediate effect. |
|
No. TM/D/4-3/ |
24 December 2021 |
Mumbai Port Trust |
Tariff for Cruise Vessels coming with crew only for crew repatriation(Corona Pandemic) |
|
GMT/45/1090 |
16 December 2021 |
Syama Prasad Mookerjee Port, Kolkata |
Circular issued by Port authority in regard to prohibition for supply of tyre fender to the vessels at Haldia port.
|
|
No.TM/S-11/88 |
14 December 2021 |
Mumbai port trust |
Registration of unorganized Dock workers on e-SHRAM Portal |
|
Tide Tables |
13 December 2021 |
Kandla Port trust |
Tide Tables for Kandla. |
|
Trade Notice DPL No.07/2021 |
09 December 2021 |
Dighi Ports Adani Ports & Logistics |
Revised Tug Hire Charges |
|
Circular |
08 December 2021 |
Adani Krishnapatnam Port Limited |
Circular issued by Adani Krishnapatnam Port Limited regarding resumption of "Normal shipping movements at Krishnapatnam Port.”
|
|
No. PHO-C/COVID-19/2021/325 |
04 December 2021 |
PHO Chennai |
PHO Chennai Circular regarding the subj for the ships calling Chennai,Ennore,Kattupalli,Karaikal ports. |
|
NMPT/DC/Per.Draft/2021/010 |
03 December 2021 |
New Mangalore Port Trust |
Permissible Draft |
|
GAD/L/GEE-Strike/4691 |
03 December 2021 |
Mumbai Port Trust |
Received from Mumbai Port Trust, stating that the Port and dock workers are going for an indefinite Nationwide strike on or after 15th December 2021.
|
|
GPL/MAR/CIR/2021-22/012 |
02 December 2021 |
Gangavaram Port Ltd. |
Formation of Depression over South East Bay and advisory thereof - Reg. |
|
No. MR/PS/4007/PA/2021 |
18 November 2021 |
Deendayal Port Trust |
PERMISSIBLE DRAFT FOR NIGHT NAVIGATION INCREASED. |
|
No. TF/SH/Circulars/2021/3861 |
17 November 2021 |
The Traffic Manager, Deendayal Port Trust |
Withdrawal of Cargo Jetty No.1 for maintenance/dredging work from 20.11.2021 to 29.11.2021 for 10 days. |
|
Trade Circulars 1421 |
15 November 2021 |
VISAKHAPATNAM PORT AUTHORITY |
BERTHING OF VESSELS IN INNER HARBOUR - REG |
|
FACILITY NOTICE N0.003/CCP/IMR/2021-22 |
12 November 2021 |
OFFICE OF THE PRINCIPAL COMMISSIONER OF CUSTOMS (PREV.), JAMNAGAR |
Customs Clearance during the Odd hours - reg. |
|
JNP/TRAFFIC/SWB/2021/731 |
08 November 2021 |
Jawaharlal Nehru Port Trust |
Construction of Ro-Ro Platform at Shallow Draught Berth of JN Port |
|
Trade Circular no. 1418 |
06 November 2021 |
Visakhapatnam Port Trust |
Renaming of Visakhapatnam Port Trust as Visakhapatnam Port Authority- Reg. |
|
GAD/G/GM-MPA/4267 |
02 November 2021 |
Mumbai Port Trust |
Re-naming of Mumbai port Trust as Mumbai Port Authority |
|
No.TM/S-1/76 |
29 October 2021 |
Mumbai Port Trust |
Registration of unorganized Dock Workers on e-SHRAM portal.
|
|
Trade Notice No. 11/2021 ref : TM/02/10/2021/1308 |
29 October 2021 |
Mormugao Port Trust |
Declared concession on VRS/CRS for vessel loading-handling Iron Ore and Iron Ore Pellets at WOB Anchorage.
This concession applicable only for vessel's handling I/Ore and I/Ore Pellets fully at west of break water anchorage, No concession for combination loading/ handling at WOB and M/D OR Berth.
This concession is applicable from 16th Sep 2021 till June 2023 (Last Vessel)
|
|
MMO/454/EST/CIR/TRADE/722 |
22 October 2021 |
SyamaPrasad Mookerjee Port,Kolkata |
Regard to practice to be adhered for vessels calling and sailing at Haldia port.
|
|
Trade Notice No.14/2021 |
11 October 2021 |
Cochin port Trust |
Cochin-Male service - Renewal of concessions - reg
Ref : Trade Notice no.06/2021 dated 22.04.2021 |
|
Adani Port & Logistics |
11 October 2021 |
APSEZL/01/2021 |
Trade Advisory on Containerized Cargo originating from Iran, Pakistan and Afghanistan |
|
IM&EE/MOF/Mech-WQ-7&8/2021/3924 |
08 October 2021 |
Visakhapatnam Port Trust |
Mechanisation of WQ - 7&8 Berths through PPP Mode on DBFOT basis - Request for Qualification(RFQ) - Reg |
|
APKL/Marine/10/2021 |
08 October 2021 |
AKPL Trade Notice |
Revision in Port Tariff wef 01.11.21.
Amendment in Tug Hire, Boat & Hydra charges |
|
Reference Ministry of Ports, Shipping and Waterways OM No. A-120221312020-PE-1 dated 02.09.2021. |
27 September 2021 |
Ministry of Personnel, Public Grievances and Pensions Department of Personnel and Training |
Shri Polamraju Lakshmi Haranadh, IRTS (1994) as Chairperson (JS Level), Paradip Port Trust |
|
Declaration of Force Maejure |
27 September 2021 |
VISAKHAPATNAM STEVEDORES ASSOCIATION |
Declaration of Force Maejure for about 72 hours due to
Cyclonic Storm Gulab - Reg. |
|
NO: ADMIN/12/8/2016-PHO-MNG |
27 September 2021 |
Port Health Organisation New Mangalore Port |
Relocation of office/reg |
|
Harbour Notice No. 10 (Temp) 2021 |
17 September 2021 |
The Mormugao Port Trust |
The Mormugao Port Trust Harbour Notice No. 10 informing the trade about the end of monsoon Season. |
|
DPCL/TRADE/08/2021 |
16 September 2021 |
Dhamra Port |
Trade notice no. 08/2021 Amendment in Tariff structure of Dhamra Port.
|
|
APSEZL/Marine/27/2021 |
16 September 2021 |
Adani Ports and Logistics |
Trade notice 27_Amendment in Tariff structure APSEZ Mundra |
|
Reference discussion in our meeting ot 07,09.2021 |
15 September 2021 |
Kandla Port Steamship Agent Association |
General Matters and issues regarding Port. |
|
GMT/45/1061 |
06 September 2021 |
Syama Prasad Mookerjee Port, Kolkata Haldia Dock Complex |
The Port circular in regard to General policy for deployment of floating cranes at Sandheads and Point " X " within the limit of Syama Prasad Mookerjee Port, Kolkata.
|
|
GMT/45/1061 |
06 September 2021 |
Syama Prasad Mookerjee Port, Kolkata Haldia Dock Complex |
The Port circular in regard to General policy for deployment of floating cranes at Sandheads and Point " X " within the limit of Syama Prasad Mookerjee Port, Kolkata.
|
|
IMAR/MSS/F/-2/2021 |
02 September 2021 |
Visakhapatnam Port Trust |
Visakhapatnam Port trust increased Maximum Permissible Beam in inner harbour (Northern end) from 38 meter to 40 meters during daylight with immediate effect. |
|
MMB/PO/RTN/GEN/772 |
29 August 2021 |
Regional Port Officer Maharashtra Maritime Board Ratnagiri |
Opening of port in Ratnagiri groups of ports |
|
APSEZL/24/2021 |
27 August 2021 |
Adani Ports and Special Economic Zone Ltd. |
Mandatory Compliance for PPE - high Visibility Vest/Jacket for Truck Drivers entering APSEZ |
|
AKPL/Marine/08/2021 |
19 July 2021 |
Adani Krishnapatnam Port |
Wavier Scheme for the Vessels using LNG(Liquefied Natural Gas) as fuel |
|
No.GM(T)/45/1043 |
29 June 2021 |
Syama Prasad Mukherjee Port, Haldia |
Syama Prasad Mukherjee Port issued a circular in regard to remission on Port charges for Handling of Domestic Thermal Coal at berth no.3 (erstwhile berth no.4 ), Haldia Dock Complex. Following remission of charges will be applicable till 30/06/2022.
1) 25% remission on vessel related charges
2) 30% remission on cargo related charges
3) 60% remission on haulage and terminal charges |
|
Trade Notice No. 10/2021 No.A1/Sunflower Oil/2021/T |
24 June 2021 |
Cochin Port Trust |
Rebate in VRC for Sunflower Oil Import through Cochin Port Trust. |
|
No.TD/TM/EXP-17/1137 |
18 June 2021 |
Paradip Port Trust Traffic Department |
Circular on Steel Vessel handling at Paradip Port Berths |
|
AHPL/Marine/16/2021 |
05 June 2021 |
Adani Hazira port Ltd. |
Handling of vessel loading export sugar |
|
NMPT/DC/2021/045 |
04 June 2021 |
New Mangalore Port Trust |
Regarding assurance of safe pilot transfer arrangement for vessels calling at New Mangalore Port |
|
No.1/4/NMPT/TM/Safety/2021/Compliance |
29 May 2021 |
New Mangalore Port Trust |
Submission of 'Undertaking from Master of vessel through the vessel agent- reg |
|
Advisory to Kakinada Anchorage & Deep Water Port Trade Members |
29 May 2021 |
The Cocanada Chamber of Commerce |
Cocanada Chamber of Commerce in their trade advisory requested all stakeholders of Kakinada anchorage port and deep sea port to regulate the cargo movement through rail wagon or by road or other means to connect to working vessels at Port due to the serge in covid-19 second wave. This will help to reduce the spread of Covid-19 second wave and deployment of the workforce. They have also decided to limit SIX normal size rice vessels and ONE rice vessel with a maximum loadable quantity of 10000 MT or below should be allotted loading turn. |
|
Notification |
29 May 2021 |
Gopalpur Ports Ltd. |
Gopalpur port declared Non Weather Working Days from 1800 hours 24th May 2021 to 1200 hours 26th May 2021 due to heavy rain and bad weather caused by cyclonic storm "YAAS".
|
|
Impact of Cyclone 'Yaas' on Port Operations |
28 May 2021 |
Dhamra Port Adani Port and Logistics |
Dhamra Port in their letter dated 28.05.2021 declared FORCE MAJEURE EVENT on account of Cyclone "Yaas" from 24.05.2021. Cessation of force majeure events will be issued later on. |
|
Operational Update at Gujarat Pipavav Port Ltd -2” |
27 May 2021 |
Gujarat Pipavav Port Limited, |
Please find attached herewith the trade advisory received from GPPL, Pipavav regarding partial Partial Non Container vessel operation resumed from 26.05.2021. Partial Marine Operations of Container will commence from 1st June 2021 00:001 hours. |
|
NO.:MD/SPG/I/41/2005/572 |
27 May 2021 |
Paradip Port Trust |
Paradip Port issued Non Weather Working Days Notification from 06:00 hours 24th May till 06:00 hours 27th May 2021. |
|
Harbour notice no. 4 (TEMP) 2021 |
13 May 2021 |
Mormugao Port Trust DC/S-(21)/2021/04 |
Weather Advisory - Formation of low Pressure |
|
Harbour Notice no. 06 (Temp) 2021 |
13 May 2021 |
Mormugao Port Trust. |
Monsoon Shipping (21st May to 15th Sept)
- Harbour Notice 05 (TEMP) 2021 under reference No. DC/S-(21)/2021-05 dated 13/05/2021
|
|
Harbour Notice No. 05/2021 |
13 May 2021 |
Mormugao Port Trust DC/S(21)/2021/05 |
The Maximum Permissible drafts in conjunction with high water, in the Harbour, during the monsoon oof 2021 |
|
No. GA/GN/5101/1776 |
13 May 2021 |
Deendayal Port Trust |
Kandla Deendayal Port Cyclonic Storm circular dated 13.05.2021 |
|
NMPT/DC/Weather/2021/030 |
13 May 2021 |
New Mangalore Port |
Monsoon Circular. |
|
Monsoon Circular |
13 May 2021 |
JSW Jaigarh Port |
Monsoon Circular. 13.05.2021 received from JSW Jaigarh Port.
|
|
No. DC/Cf(M) Circular /2021 |
13 May 2021 |
Cochin Port Trust |
monsoon circular issued by DC CPT dated 13.5.2021. Fyi Twin screw boats and IV Class barges will not be permitted after 1st June till 31st August. RSV-4 and MS class barges will be able to continue to ply to anchorage also during monsoon for effecting bunker supplies.
Also presently Cochin is having the cyclonic effect and hence for a few days we anticipate bad weather and boats may not be able to ply to anchorage. |
|
FORCE MAJEURE AT GOPALPUR PORTS |
12 May 2021 |
GOPALPUR PORTS LTD. |
NOVEL CORONAVIRUS DISEASE (COVID-19) - SECOND WAVE - INVOCATION AND
NOTIFICATION OF FORCE MAJEURE AT GOPALPUR PORTS LTD. |
|
JNP/Marine/DC/Nav.Safety/2021/152 |
10 May 2021 |
Jawaharlal Nehru Port Trust Local Notice to Mariners No. 3/2021 |
Further to message dtd 17/12/2020, please find attached herewith latest local notice to Mariner No 3/2021 dated 10/05/2021 received from Jawaharlal Nehru Port
Authority. |
|
No.104/PSEC/COVID19/2021 |
08 May 2021 |
Karaikal Port |
Force Majeure Declaration letter received from Karaikal Port in connection with COVID-19 Second Wave. |
|
Force Majeure |
08 May 2021 |
Karaikal Port |
Force Majeure Declaration letter dated 8th May 2021 received from Karaikal Port in connection with COVID-19 Second Wave, |
|
Annexure to G O (Rt) 404./2021 |
06 May 2021 |
Government of Kerala. |
Guidelines on the measures to be taken by Offices of Government of India/ Departments of Government of Kerala. |
|
No. NMPT/TM/MOS/2021 |
06 May 2021 |
New Mangalore Port Trust |
Directions under Section 111 of Major Port Trust Act, 1963 regarding handling of vessels containing COVID related cargo |
|
Trade Notice No. 7/2021 |
28 April 2021 |
Cochin Port Trust Circular No.7 for vessels carrying Covind-19 related cargoes. |
Cochin Port Trust, declaring that they are giving highest berthing priority, exempt VRC & Handling Charges for 3 months for vessels carrying covid-19 related cargoes.
|
|
NO. NMPT/DC/Per.Draft/2021/005 |
27 April 2021 |
New Mangalore Port Trust |
The maximum permissible Draft at Berth No.10 (MRPL berth) has been increased to 14 M with 1 M height of tide with immediate effect. Circular issued by D/C, NMPT is attached herewith for your reference. |
|
No. TO(Sh&CH)/10/1016 |
26 April 2021 |
Syama Prasad Mookerjee Port, Kolkata |
Syama Prasad Mookerjee Port, Kolkata/Haldia - declaring that they are Exempted VRC & Handling Charges for 3 months for vessels carrying covid-19 related cargoes. |
|
G.O.(Rt)No.404/2021/DMD |
26 April 2021 |
GOVERNMENT OF KERALA |
Disaster Management Department - Covid-19 – containment activities-lock down in the State from 8th May 2021-orders issued |
|
The Ghandhidham Chamber of Commerce and Industry |
15 April 2021 |
The Ghandhidham Chamber of Commerce and Industry |
An Appeal from Ghandhidham Chamber of Commerce and Industry to the Businessmen to take a decision in their own capacity to shut down their business for a few days to contain further spreading of Corona Pandemic. |
|
Circular No. GA/GN/1005/1751 |
15 April 2021 |
Deendayal Port, Kandla |
Updated SOP for Crew Change |
|
Dighi port/ Marine/03/2021 |
05 April 2021 |
Dighi port- Adani ports and logistics |
Port environment protection safety charges |
|
No. TF/SH/Berthing policy/Corresp/2019-II/882 |
05 April 2021 |
Deendayal Port Trust |
Berthing policy w.e.f. 14th April 2021 |
|
No.NMPT/DC/PER.DRAFT/2021/004 |
01 April 2021 |
NEW MANGALORE PORT TRUST |
PERMISSIBLE DRAFTS |
|
JNPT/T/LBS/JLCBUA/20-21/7946 |
25 March 2021 |
PPD/DM/TFO/MISC/2020/48, Dated 20th January 2021 |
Suspension of liquid cargo operation from 16/04/2021 since the tank terminals Association are not repairing the trestle structure of carrying pipelines of various shore tank terminals from the Port area to respective terminals areas.
|
|
No. TF/SH/1001/ |
16 March 2021 |
Deendayal Port Trust |
For considering vessel berthing after submission of payment receipt of wharfage charges.
|
|
Ref: APMB GO RtNo.4 dated 03.02.2021 |
26 February 2021 |
Kakinada Seaport Limited |
Kakinada Seaport Ltd Trade circular for Rice vessels with incentives/tariff discounts during Trail period six months |
|
No.NMPT/DC/Per.Draft/2021/002 |
24 February 2021 |
New Mangalore Port Trust |
Permissible Draft at Berth No. 16 (JSW Berth) Increased to 14 meters . |
|
No.TD/TM/GEN-201/105 |
18 January 2021 |
Paradip Port Trust Traffic Department |
Servicing of Cape Size/ Baby Cape Size Vessels at Paradip Port |
|
Trade Notice No. 01/2021 |
15 January 2021 |
Mormugao Port Trust Goa, Ref. No. TM/02/27/2021/1638(B) |
Mandatory Advance estimate and payments of Port Charges through PCS - reg. |
|
APSEZL MUNDRA MONTHLY DRAFT DECLARATION - JANUARY- 2022 |
14 January 2021 |
Adani Port & Logistics |
APSEZL MUNDRA MONTHLY DRAFT DECLARATION - JANUARY- 2022 |
|
General Instructions Dt. 12.01.2021 |
12 January 2021 |
Paradip Port Trust |
General Instructions Dt. 12.01.2021 to all vessels calling Paradip |
|
APSEZL/Marine/02/2021 |
08 January 2021 |
Adani Mundra Port |
Vessel Shifting Charges Due to Bad Weather & Force Majeure incident |
|
Trade Circular No. 1339 |
07 January 2021 |
Visakhapatnam Port Trust, No: ITRA/SHP/FCIR |
Declaration of maximum allowable draft at WQ-6 berth in Northern Arm of
Inner Harbour Reg. |
|
Trade Notice No. 10/2021 |
07 January 2021 |
Mormugao Port Trust, TM/328/2021/1564 |
SOP for handling vessels calling within 14 days from last foreign country/Port. |
|
Trade Circular No. 1338 |
07 January 2021 |
Visakhapatnam Port Trust |
Trade Circular No. 1338
Capacity Augmentation of OR-III - Berth Specification Permissible LOA 160 meters, Permissible Draft: 11.00 meters, Beam: No restriction Manifold connections: Ready from all OMCs working at OR-I & OR-II jetties.
Also please note OR-I will be decommissioned with effect from 16.01.2021 due to capacity augmentation work. |
|
Port Charges |
30 December 2020 |
Krishnapatnam Port Company Limited |
Revised their Port charges with effect from 15.01.2021. |
|
No. MAR/PRF/01/D-657 |
29 December 2020 |
VOC Port, Tuticorin |
Port Circular regarding Utilization of Centrlised Port Reception Facility prior 24 hours of vessels arrival to the port. |
|
No.Mrn/97/580 |
28 December 2020 |
Shyama Prasad Mukherjee Port (Kolkata Port Trust) |
Additional Anchorages below point "X" in Inner Sandheads |
|
lifted Force Majeure |
26 December 2020 |
Krishnapatnam Port |
lifted Force Majeure effective from 26.12.2020 2000 LT. |
|
JNPTMarine/cir./2020/905 |
17 December 2020 |
Marine Circular (Safety) Jawarharlal Nehru Port Trust |
Advisory to the vessel Berthing at BPCL in view of the construction of additional Liquid Bulk |
|
JNP/Marine/Cir./2020/905 |
17 December 2020 |
JNPT MARINE CIRCULAR (SAFETY) |
Regarding Safety " Advisory to the vessel berthing at BPCL in view of the construction of Additional liquid berth" |
|
Marine Notice 01/2020 |
09 October 2020 |
Gujarat Chemical Port Ltd) GCPL), Dahej. |
Compliance to MARPOL Annex - VI at GCPL - Dahej |
|
AHPL/Marine/10/2020 |
06 October 2020 |
Adani Hazira Port |
Guidelines on compliance with MARPOL Annex VI |
|
Trade notice AP(D)PPL/11/2020 |
05 October 2020 |
Adani Petronet (Dahej) Port Pvt. Ltd., Dahej/ Trade Notice no 11 |
Compliance to MARPOL ANNEX-VI at AP(D) PPL |
|
Trade notice AP(D)PPL/11/2020 |
05 October 2020 |
Adani Petronet (Dahej) Port Pvt. Ltd., Dahej/ Trade Notice no 11 |
Compliance to MARPOL ANNEX-VI at AP(D) PPL |
|
DPCL/TRADE/08/2020 |
03 October 2020 |
Adani Port Dhamra |
Trade Notice No: 08/2020 – Guidelines on compliance with MARPOL Annex VI _ Discharge of water from open loop scrubber. |
|
Circular no: MIDPL/08/2020 // |
03 October 2020 |
KATTUPALLI PORT CHENNAI’s NEW GATEWAY |
Guidelines on compliance with Annex VI compliance. |
|
No:MD/ACCTS/WK-R-1/2020/ 1O10 |
10 September 2020 |
Paradip Port Trust |
agencies licenced by Paradip Port Trust for collection / removal/ disposal of garbage from various vessels at Paradip Port Harbour |
|
No. TD/TM/GEN-201/2437 |
02 September 2020 |
Paradip Port Trust Traffic Department |
Servicing of Cape size/Baby cape size vessels at Paradip Port |
|
MD/NAV/2019/105 |
10 September 2019 |
Gopalpur Port Limited |
Maximum Permissible LOA, Berth & Draft of vessel at Gopalpur Port |
|
MD/NAV/2019/99 |
02 September 2019 |
Gopalpur Ports Limited |
Procedure for Vendors of various categories to board the vessel. |
|
MD/NAV/2019/96 |
20 August 2019 |
Gopalpur Ports Limited |
Minimum Draft requirement for safe Navigation in Port. |
|
MD/PRF/2019/94 |
19 August 2019 |
Goplapur Port Limited |
Utilization of Centralized Port Reception Facility Portal: Swachh Sagar. |
|
MD/NAV/2019/91 |
14 August 2019 |
Gopalpur Port Limited |
Procedure for berthing / un-berthing / shifting at Gopalpur Port. |
|
MD/NAV/2019/76 |
26 July 2019 |
Gopalpur Port Limited |
Loading, Stowage & Carriage of High Density Solid Bulk Cargo of Group-A such as Iron Ore Fines, Chrome Ore, Concentrates, etc |
|
MD/NAV/2019/75 |
25 July 2019 |
Gopalpur Port Limited |
Maximum Permissible LOA, Berth & Draft of vessels at Gopalpur Ports |
|
MD/NAV/2019/69 |
09 July 2019 |
Gopalpur Port Limited. |
Precautions to be taken by vessels alongside the berth during Monsoon / Rough Weather. |
|
GPL/PRF/2019/01 |
01 July 2019 |
Gopalpur Port Limited |
Utilization of Centralized Port Reception Facility Portal |
|
MD/NAV/2019/54 |
11 June 2019 |
Gopalpur Port Limited |
Circular regarding Inspection, Free Pratique and signing of DO's |
|
30/2016 |
26 August 2016 |
Foreign Shipping Companies for NOC, PCC Voyage Return/Assessment Streamlining process |
Streamlining processes for No Objection Certificate(NOC), Port Clearance Certificate (PCC), Voyage Return or Voyage Assessment in the case of Foreign Shipping Companies. |
|
Amendment to NO.06/2015-2020 dated 13 may 2022 |
24 May 0002 |
Kandla Port Steamship Agent Association |
Waiver of Berth hire/Penalty charges for vessels suspended loading operation of wheat. |
|